

Doors, frames and hardware (Division 8) takeoff and estimating
Maverick Takeoff Solutions provides Division 8 estimating services, quoted per project: US based estimators return an opening by opening door and frame schedule with the hardware sets rolled up, an RFI list and, if you want them, a Comsense ready import and wood door RFQ lines. Standard turnaround is 3 business days from complete documents.
3 business days from complete documents; rush quoted per job
- 100 percent US based estimators
- Jesse Byrd reviews every set before delivery
- Corrections to our work are free; client revisions and new addenda are billable
Maverick Takeoff Solutions is the outsourced Division 8 takeoff and estimating desk for door and hardware distributors, installers and specialty subcontractors. US based estimators build the schedule from the bid set, verify pairs against the plans, roll up hardware sets down to the hinge pair, write the RFIs, and deliver a Comsense ready import and wood door RFQ lines. Quantity only unless you ask for pricing. Each job is quoted per project, and standard turnaround is 3 business days from complete documents.
More door schedules than detailers
Division 8 bids pile up the same way every time. A hotel set lands with a guestroom door schedule, a per floor common area schedule, a door type sheet, partition types on another sheet and hardware groups that point to a supplier schedule nobody has sent yet. Somebody has to put the openings together before anyone can price a frame or quote a lockset.
If that somebody is one detailer who is already on two other bids, the third one gets passed or gets rushed. Rushed Division 8 takeoffs fail in predictable places: a pair counted as a single, a frame throat that does not match the wall, a hardware group that never got its closer, a fire label missed on a corridor door.
We are the extra detailer. You keep the pricing, the supplier relationships and the decisions. We do the count, the schedule and the cleanup, and we flag what the drawings got wrong before it becomes your problem at order time.
What comes back on every Division 8 takeoff
Every project comes back as a scope workbook built from your bid set. Every quantity is a formula, the totals are reconciled, and Jesse reviews every set before it leaves us.
Door and Frame Schedule. One row per opening line: door mark, location and room, category, opening and leaf count, door type, size (width x height x thickness), door material, frame type, material and throat, fire rating, exterior yes or no, hardware set, scope and notes. Typical guestroom doors are built from the unit composition times unit count times floors, with the unit mix left as editable inputs so you can see exactly where each number comes from. Storefront, automatic entrances and gates by others stay visible in grey so nothing silently disappears.
Hardware. When the set defines hardware sets, you get the set list with opening counts and a component tab: each component per set times the openings it serves, then a project rollup of hinge pairs, closers, locksets, exit devices and the rest. When the architect lists only group numbers and function checkmarks, you get a hardware groups and functions tab (closer, card reader, mag hold, panic, smoke, temperature rise, hurricane) with project totals, and the missing supplier schedule goes to the top of the RFI list.
RFIs and Questions. Every conflict we find, ranked by priority, with why it matters to your bid. Leaf count disagreements between the schedule and the plans, frame types that do not match the wall, rated openings on unrated hardware groups, missing door types.
Scope and Notes. Inclusions, exclusions, the governing drawing notes, and the spec sections that apply: 08 11 13 hollow metal, 08 14 16 wood doors, 08 41 13 storefront, 08 71 00 door hardware.
Comsense / DS import, if you use it. A tab delimited import file and the Excel template, generated from the finished schedule and validated row by row against your code tables before delivery. Details on the Comsense ready door schedule entry page.
Wood door RFQ lines, if you want them. Wood openings filtered from the same schedule, identical builds consolidated, quantities summed, preps written from the hardware sets, in a format you can paste into the email to your door supplier.

The checks that keep a Division 8 count right
Door counts are easy to get wrong in ways that do not show up until the frames arrive. These are the checks our estimators run on every set, because they are where Division 8 takeoffs usually fail.
Pairs are verified on the plans, not taken from the schedule. Schedules routinely show a pair on an opening that is drawn as a single, and the reverse. We check every opening against the floor plan, and any disagreement goes on the RFI tab with the door mark and the sheet.
Typical floors and units are verified, not assumed. On hotels and multifamily, guestroom door counts come from the enlarged unit plans for each unit type, including the accessible variants, multiplied by the unit matrix and the floors. One wrong unit composition repeated across eight floors is a large miss.
Jamb depth comes from the partition types. The frame throat on each opening is taken from the wall type it sits in, not guessed from a typical.
Fire labels and exterior openings are carried on every line. Rated openings, exterior openings and hurricane rated openings are flagged in their own columns, so they can be filtered, counted and checked against the hardware groups that serve them.
Totals reconcile. Openings, leaves and Division 8 leaves on the schedule match the hardware counts and, when you take it, the import file line count, minus whatever was excluded as by others. If they do not tie, the file does not ship.
Who uses our Division 8 takeoffs
Door and hardware distributors with more bids than detailers, who need the openings loaded into Comsense so their own estimators can spend the day pricing instead of keying. We work as your overflow, in your format.
Door, frame and hardware installers and specialty subcontractors who bid Division 8 alongside Divisions 9 and 10 and need a schedule they can trust before they ask a supplier for numbers.
Teams bidding hotels and multifamily, where the unit matrix, floor by floor breakdown and common area versus unit split decide whether the bid is right. That is the work our Division 8 process was built around.
Not the right fit: architects and owners who need a hardware specification written, or a hardware submittal prepared or sealed by a DHI certified Architectural Hardware Consultant. We are not AHCs and we do not present the takeoff as a submittal.
Ways to get Division 8 estimating services, compared
Your own detailer, takeoff software your staff run, a supplier's free estimate or a freelance marketplace can each work for someone; the tradeoffs are on outsourced takeoffs versus a supplier's free takeoff and outsourced vs in house estimator. Maverick fits distributors and subs who need the count, the RFIs and the Comsense import done by a US based estimator without adding a detailer, quoted per project on opening count, hardware sets, unit types and floors.
AI helps here too. We use it to assist our estimators with document review. It does not replace the estimator who decides that opening 214 is really a single.

How a Division 8 takeoff moves through our shop
- You send the set. Architectural drawings, the door schedule sheets, the door and frame type sheet, partition types, unit plans and the spec book if there is one. Tell us your format: our workbook, a Comsense import, an RFQ, or all three. Tell us the bid date.
- We confirm scope and timing before we start. If the set is missing the hardware schedule or the spec, we tell you at intake, not on delivery day. You get a delivery time when we receive the set. Standard turnaround is 3 business days from complete documents; rush is quoted per job.
- We build the schedule. Opening by opening, verified against the plans and the unit matrix, with hardware sets or groups captured as the drawings define them.
- QA before delivery. Jesse reviews every set before delivery. Openings, leaves, hardware counts and the import line count have to reconcile, and the validator has to come back clean against your code tables.
- You get the files and the RFI list. Ask us anything about a line; we point you to the sheet it came from.
- Addenda and revisions. When an addendum changes the schedule, we rerun the affected openings and show you what changed. Client driven revisions and addenda are billed as new scope. Corrections to our own work are free.
How a takeoff moves through our QA
Pricing is quoted per project; how every trade is priced is on pricing. Flat fee extras we offer with a takeoff are listed on add ons.
The Comsense / DS import and the wood door RFQ lines are quoted with the takeoff.
Quantity only unless pricing is requested. Comsense is a product of its owner; Maverick is not affiliated with Comsense or Advantive.
Takeoff, then RFQ
Once the schedule is right, the next job is getting pricing back from manufacturers. We can turn the same schedule into manufacturer RFQs for doors, frames and hardware, collect the quotes and lay them side by side for your estimator. That work sits under our construction procurement support for subcontractors.
See manufacturer RFQs for doors and hardware
When the job is awarded, we can also help put together the product data for a Division 8 submittal from the same schedule. That is document assembly for your team to review, not an AHC review or a sealed submittal.
Before you spend detailer hours on a large hotel or multifamily set, we can also tell you whether it is worth bidding at all. See ITB and bid review: should you even bid it.
If Division 8 overflow is a weekly problem rather than an occasional one, an outsourced estimating department with a dedicated estimator may fit better than project by project orders.
What you receive
- Door and Frame Schedule
- Hardware set list and component rollup
- RFIs and Questions
- Scope and Notes
- Comsense / DS import, if you use it
- Wood door RFQ lines, if you want them
How it is priced
Quoted per project, with the price drivers named.
What sets the price
- Opening count
- Hardware sets or groups
- Typical unit types and floors
- Comsense import and RFQ lines
Questions and answers
Do you price the doors, frames and hardware?
Not by default. Division 8 takeoffs from Maverick Takeoff Solutions are quantity only: openings, leaves, frames, hardware sets and components. Your estimators keep the pricing in Comsense or your own system. If you want manufacturer pricing gathered, we can send RFQs to manufacturers and compare the quotes as a separate service.
Can you deliver the takeoff as a Comsense import?
Yes. From the finished door and frame schedule we build a Comsense / DS import file and the Excel template, and validate every row against your code tables before delivery. Door marks go in the opening field and jamb depth comes from the wall types. Maverick is not affiliated with Comsense or Advantive.
What if the architect only lists hardware group numbers?
Then Maverick Takeoff Solutions maps each group to its functions (closer, card reader, mag hold, panic, smoke, temperature rise, hurricane) and counts openings per group, and the missing supplier hardware schedule becomes the first RFI. We say plainly when preps on an RFQ were inferred from function flags rather than taken from a component list.
Are you an Architectural Hardware Consultant?
No. Maverick Takeoff Solutions does the takeoff and the quantity side of Division 8 for the bidding and supply side. We do not write hardware specifications or seal hardware submittals. If a spec requires a DHI certified AHC, that remains with your AHC.
How fast do you turn a door schedule around?
Standard turnaround for a Division 8 takeoff at Maverick Takeoff Solutions is 3 business days from complete documents. Rush is quoted per job. Large hotel and multifamily sets can take longer; we give you a delivery time when we receive the set, before we start, and Jesse Byrd, the founder, reviews every set before delivery.
What happens when an addendum changes the door schedule?
Maverick Takeoff Solutions reruns the affected openings, shows what changed opening by opening, and updates the import and RFQ from the revised schedule. Client driven revisions and addenda are billed as new scope and quoted before work starts. Corrections to our own work are free.
How is this different from AI takeoff software?
Software can find and count doors. Assigning hardware sets, checking pairs against the plans, taking jamb depth from the partition types and writing the RFIs still takes an estimator, and some AI vendors say so on their own pages. Maverick Takeoff Solutions uses AI to assist our estimators, not to replace them.

Send the bid set
Send the bid set and the due date, and the quantities come back in 3 business days from complete documents; rush is quoted per job.
