Should you even bid it? ITB and bid review for subcontractors
Maverick Takeoff Solutions offers a bid review service for subcontractors: we read the ITB, specs, addenda and subcontract terms, score the job on eight factors and return a one page Bid Snapshot with a go, go with conditions or no go verdict before your estimator starts. Each review is quoted per bid package; with a takeoff, the snapshot is $100.
- 100 percent US based estimators
- Jesse Byrd reviews every set before delivery
- Corrections to our work are free; client revisions and new addenda are billable
A bid review answers one question before your estimator starts the takeoff: should you bid this job at all? Maverick Takeoff Solutions reads the ITB, specs, addenda and subcontract terms, scores the project on eight factors, and returns a one page Bid Snapshot with a go, go with conditions or no go verdict, key dates, scope and risks.
What the bid review tells you before you commit estimator time
Your estimator opens an invitation, downloads 400 sheets and a project manual, and finds out three hours later that the flooring scope is mostly owner furnished, the bid is due before the last addendum, and the GC wants a bid bond on a job that size. Some of those jobs were never yours to win: the wrong size for your crews, a design still full of TBD tags, a GC who sends invitations for budget numbers, or pay if paid language with ten percent retainage. A bid review moves that discovery to the front.
For each ITB we answer:
| Question | What you get |
|---|---|
| What is this project? | Building type, size, phase, owner type and how it is funded, delivery method, and the GC. |
| Which part is ours? | The scope that applies to your trade, the specification sections that govern it, the material types, and an approximate scope size. |
| When is everything due? | Bid date, RFI cutoff, prebid meeting and site walk, addenda issued so far, and the schedule and number of mobilizations you would be committing to. |
| What do they require to bid? | Bid form, bonds, insurance limits, prequalification, wage requirements, alternates and unit prices requested. |
| Where is the risk? | Retainage, pay terms, liquidated damages, scope gaps, items by others, TBD tags, conflicts between the finish schedule and the specs. |
| Should we bid it? | A go, go with conditions, or no go verdict with the reasons written down, and the questions to send the GC if you go. |
What you receive: the Bid Snapshot
The Bid Snapshot is one page your owner or precon lead can read in two minutes. Each part is there for a reason.
Deadline banner. Bid date, RFI cutoff and the number of days left, so nobody is surprised.
Eight factor scorecard. Each factor rated Favorable, Caution, Watch or Action Required, with one line saying why.
Scope magnitude. Approximate quantity of your scope by zone or building area, so you can tell whether the job fits your crews and bonding before anyone measures a room.
Commercial terms. Bonds, insurance, prequalification, wage requirements and key contract terms pulled from the bid documents and the subcontract, if one was issued.
Open items. The questions that could change your number, tagged HIGH, MED or INFO, each pointing to the plan sheet or specification section where we found it.
The eight factors we score
These come from the bid intelligence process we run on real bid sets, not from a generic checklist.
| Factor | What we look at | What usually turns it to Watch or Action Required |
|---|---|---|
| 1. Distance | Travel from your shop or nearest branch, mobilization cost | A job outside the area your crews normally work, with no per diem in the bid |
| 2. Size and fit | Approximate scope size against the jobs you usually win | A job far larger than your usual range, or a scope that is mostly a product you do not install |
| 3. Owner and funding | Public or private, funding source, owner type | Unclear funding, a private owner with no track record, or phased funding that can stop the job |
| 4. Design completeness | Drawing phase, number of TBD tags, finish schedule completeness | A finish schedule with many TBD tags, or documents still at design development |
| 5. Schedule and mobilizations | Duration, phasing, number of mobilizations, overlap with your backlog | Many short mobilizations, night or occupied work, or a start date that collides with jobs you already hold |
| 6. Contract terms | Retainage, pay if paid or pay when paid, bonds, liquidated damages, insurance limits | Retainage above your normal, pay if paid, bond required on a small scope, LDs passed through to your trade |
| 7. GC relationship | Your history with this GC, how often you win their bids, whether this is a budget round | A GC you have never won with, or an invitation that is really a budgetary number |
| 8. Scope clarity | How cleanly the documents define your scope | Items by others not defined, conflicts between specs and the finish schedule, alternates that change the scope |
The verdict is set by a person, not by a formula. Two Watch ratings on a job you badly want may still be a Go. One Action Required on contract terms may be a No Go. We write down the reason either way.
How a bid review works
- Send the bid package. Upload the ITB, drawings, project manual, addenda and the subcontract or GC terms if you have them through the request form. Tell us your trade, your normal job size and anything you already know about the GC.
- We read it. A member of our US based estimating team reads the invitation, the specification sections for your trade, the finish schedule and the commercial terms. AI tools help us find and sort pages in a large bid set faster. They do not make the call. A person does, and Jesse reviews every Bid Snapshot before it goes out.
- We score it and write the verdict. Eight factors, one rating each, a verdict with the reasons, and the open questions worth sending to the GC before bid day.
- You get the Bid Snapshot. Delivered to your client portal or a restricted folder on the date we confirmed in writing before starting.
- If you go, we keep going. The same team can move straight into the scope analysis and takeoff from the same documents, so nobody reads the bid set twice.
Read the full process, including how we handle corrections versus revisions, on How we work.
Ways to answer "should we bid it," compared
There is more than one way to make this call. Here is how each one compares.
| Option | What it is | Cost | Strengths | Limits | Best for |
|---|---|---|---|---|---|
| Your own estimator or owner reads it | The person who will do the takeoff reads the package first | Their hours, taken from takeoffs due this week | Knows your crews, your backlog and the GC better than anyone outside your company | Bid review competes with takeoffs on the same deadline, so it gets skipped when bid season is busy | Shops with estimator time to spare and a GC they know well |
| A free bid or no bid scorecard or checklist | Online scorecards, frameworks and checklists published by construction software vendors | Free | Fast, structured, makes the team ask the same questions every time | Someone still has to read the documents to fill it in; the scorecard does not find the TBD tags or the pay if paid clause for you | Teams that already read every package and want a consistent format |
| Bid evaluation firms that serve owners and GCs | Consultants that review and evaluate bids that have been submitted | Not published on the page reviewed | Deep bid evaluation experience | Built for the party receiving bids, not the subcontractor deciding whether to submit one (based on the service page reviewed 2026.11) | Owners and GCs comparing bids they received |
| A takeoff service | You send the plans, they send quantities | Per takeoff | Quantities without using your estimator's hours | Starts counting without asking whether the job is worth counting. | Jobs you have already decided to bid |
| Maverick ITB and bid review | A person reads the full package, scores eight factors, writes the verdict, and can continue into the takeoff | Quoted per bid package; the quote names the drivers | Written verdict with sources, trade specific factors, the same team continues to scope analysis and takeoff, 100 percent US based | You still own the decision, and we know less about your GC relationship than you do, so we ask. Not a cost estimate and not legal advice | Subcontractors with more ITBs than estimator hours who want the read done before the takeoff starts |
Reviewed 2026.11. Third party descriptions are taken from each provider's own public page and may have changed since.
Weighing your own estimator's hours against sending the work out? See outsourced estimating vs an in house estimator.

What it costs
A bid review is quoted per bid package before we start, and the quote names what drives it: the sheet count, the spec sections and the number of trades you carry.
Think about it in estimator hours. If a takeoff on a midsize commercial job takes your estimator most of a day, every job you pass on early gives that day back to a job you can win. See pricing for how takeoffs and monthly packages are priced, and add ons for the flat fee extras you can order with a takeoff.
Ordered with a takeoff, the Bid Snapshot is a flat $100 per job, and the full scope analysis report, snapshot included, is $200 per job.
Related Preconstruction Intelligence services
Specification review. The spec sections, finish schedules and product requirements for your trade, read before the takeoff, not after the submittal is rejected.
Addendum and revision analysis. When addendum 3 lands two days before bid, a delta report showing what changed and how much.
Scope analysis. Your scope written as Above the Line, Below the Line and Exclusions, so the number you submit matches the work you intend to do.
Contract commercial risk review. Payment terms, retainage, indemnification, insurance, LDs and notice provisions flagged before you sign. A commercial risk review, not legal advice.
Often paired with: Takeoff and Estimating. If the verdict is go, the takeoff is next. Commercial flooring, painting, drywall, fencing, and doors, frames and hardware, delivered by the same team from the same documents.
General contractors can also send a bid package for a finish trade scope check; see services for general contractors.
Bid review is one part of the outsourced estimating department Maverick runs for subcontractors: qualify the bid, measure the job, take it off, handle the revisions, and verify field conditions before you order.
If the answer is go, the takeoff comes next.
What you receive
- Deadline banner
- Eight factor scorecard
- Scope magnitude
- Commercial terms
- Open items
How it is priced
Quoted per project, with the price drivers named.
What sets the price
- Sheet count
- Spec sections
- Number of trades you carry
Questions and answers
What is an ITB review?
An ITB review is a read of the invitation to bid and its documents before any takeoff starts. Maverick pulls out what the project is, which scope is yours, the dates and bid requirements, the commercial terms and the risks, scores the job on eight factors, and gives a written go, go with conditions, or no go.
How do I decide whether to bid a project as a subcontractor?
Check eight things before you spend estimator hours: distance, size and fit for your crews, owner and funding, design completeness, schedule and mobilizations, contract terms such as retainage and pay if paid, your history with the GC, and how clearly your scope is defined. If several come back as real problems, look hard at a conditional bid or a pass.
How fast do I get the Bid Snapshot back?
Maverick Takeoff Solutions confirms the delivery date for the Bid Snapshot in writing before we start. Tell us the bid due date when you upload and we will say plainly whether we can make it. If the date is tight, rush is quoted per job before we begin, never added after.
What does a bid review cost?
A bid review from Maverick Takeoff Solutions is quoted per bid package before we start, and the quote names what drives it: the sheet count, the spec sections and the number of trades you carry. You get a written go, go with conditions or no go, with the scope, dates, commercial terms and risks behind it.
Is a bid review the same as a takeoff?
No. A bid review tells you whether to bid and what to watch for. It gives an approximate scope size, not measured quantities. If you decide to bid, the takeoff is the next step and Maverick can do it from the same documents.
Is the contract part of the bid review legal advice?
No. Maverick flags commercial terms such as retainage, pay if paid, bonds, insurance, liquidated damages and notice periods so you know what you are walking into. It is a commercial risk read, not legal advice. Take anything that worries you to your attorney.
What do you need from me to start?
The invitation to bid, the drawings, the project manual or specifications, any addenda issued so far, and the subcontract or GC terms if they were included. A link to the GC's bid portal works if you can share access. Tell Maverick Takeoff Solutions your trade and the size of job you normally take on.
Are my bid documents kept confidential?
Yes. At Maverick Takeoff Solutions your documents stay in a client portal or a restricted folder, and only the estimators assigned to your project can open them. We sign an NDA on request. Everyone who opens them works in the United States.

Send the ITB
Send it with the due date, and we confirm scope, price and delivery date in writing before any work starts.