Takeoffs and bid leveling support for general contractors

Maverick Takeoff Solutions provides takeoff services for general contractors in flooring, painting, drywall and Division 8, so you can level finish trade sub bids against measured quantities and find missing scope. Flooring is $0.0125 per SF with a $125 project minimum; other trades and bid leveling are quoted per project, 3 business days from complete documents.

Send a bid set

General contractors can send finish trade packages to Maverick Takeoff Solutions for trade level takeoffs, bid leveling support and scope gap review in flooring, painting, drywall and Division 8, plus field verification in Palm Beach County. Pick Maverick to check sub bids against measured quantities; if you need an all trades priced estimate, keep an in house precon team or a full service firm for that.

Disclosure. I run Maverick Takeoff Solutions, so the comparison on this page is written by one of the options in it. No option is ranked, and each one has a "best for" line, including the cases where you should not hire us.

Send the bids you want leveled

Built for subcontractors, useful to the GC across the table

Maverick is an outsourced preconstruction and estimating department for commercial subcontractors. Flooring, painting, drywall, fencing and door hardware contractors send us their bid sets, and we read the finish schedule, the door schedule, the specs and the addenda the way their own estimator would.

That is the reason a GC precon team would send us a package. The finish trade bids on your desk were written by people doing exactly that work. When you need someone to read those bids the way the sub wrote them, check the quantities against the drawings and find what fell between two trades, it helps to have a team that does the subcontractor side of the same work.

We support GCs in four ways:

Trade level takeoffs. Quantities for one finish package or several: commercial flooring takeoff, painting and wallcovering, drywall and Division 8 doors, frames and hardware. Use them to set a budget number for the package, to check a sub's quantities, or to cover a trade where you received one bid or none.

Bid leveling support. Every bid for a trade put on the same scope, with quantities, inclusions, exclusions, qualifications, alternates and unit prices side by side.

Scope gap review across trade bids. The items that sit between flooring, painting, drywall, Division 8 and your own scope, checked against what each bidder carried, so you see what nobody priced before you award.

Field verification in Palm Beach County. Existing conditions measured and plan versus field checked on site before you buy out a finish package.

Where finish trade scope gaps hide

A scope gap is required work that no bid carries. Procore's definition is the plain one: an item of required work not captured in any contractor's scope. On finish packages, gaps sit at the interfaces, because each sub writes its exclusions to protect itself and nobody writes the other trade's inclusions.

This is the checklist we run when we review finish trade bids for a GC. The middle column tells you where to look in your own documents if you want to run it yourself.

Interface item Between Where to look What the leveling sheet records
Floor preparation, patching and leveling compound Flooring, GC Flooring spec section, Part 3 preparation; finish plan notes Which bidders carry prep, as a lump sum, a unit price or an exclusion
Moisture testing and mitigation Flooring, GC Flooring spec section; Division 03 slab notes Carried, unit priced or excluded, per bidder
Resilient or rubber base Flooring, painting Finish schedule base column; wall finish legend LF in our takeoff against LF in each flooring bid; any "base by others"
Transition strips and thresholds at doors Flooring, Division 8 Finish plan; door schedule; hardware sets that list thresholds Each count by type, and whether the threshold sits in the hardware set or the flooring bid
Field painting of hollow metal doors and frames Painting, Division 8 Door schedule finish column; painting schedule Opening count to be field painted and which bid carries it
Finishing of wood doors Division 8, painting Door schedule; wood door spec section Factory finished or field finished, and who carries it
In wall blocking for hardware and wall mounted items Drywall, Division 8, GC Drywall and framing spec sections; interior elevations Carried or excluded by the drywall bidder
Level of drywall finish under paint and under wallcovering Drywall, painting Gypsum board finishing spec; finish schedule Finish level each drywall bid states against what the spec calls for
Wallcovering substrate preparation and primer Drywall, painting Wallcovering spec section Which bid carries the primer and prep
Firestopping and fire caulking at rated walls Drywall, GC Life safety plan; firestopping spec section Carried, excluded or "by others" in the drywall bid
Electrified hardware wiring and power supplies Division 8, electrical, low voltage Hardware sets; electrical and low voltage sheets Which hardware items are electrified and who is shown wiring them

None of this is new to an experienced GC estimator. The point is that it gets checked line by line, against the documents and against every bid, on bid day when your team has fifteen other packages open.

For example: three flooring bids against one takeoff

The numbers below are an illustration, not a real job. They show what a leveling sheet does with three flooring bids on an office tenant improvement.

Our measured takeoff from the drawings: 22,950 SF net carpet tile, 4,120 SF net LVT, 3,860 LF resilient base, 46 transitions. The flooring spec calls for moisture testing and mitigation "as required" with no quantity.

Item Our takeoff (net) Bid A Bid B Bid C
Carpet tile 22,950 SF 21,400 SF 24,800 SF, states 8 percent waste 23,000 SF
LVT 4,120 SF 4,100 SF 4,450 SF, states 8 percent waste 4,150 SF
Resilient base 3,860 LF 3,800 LF 3,860 LF Excluded, "base by others"
Transitions 46 each Not listed 46 each 40 each
Moisture testing and mitigation Spec says "as required" Excluded Testing included; mitigation as a unit price Excluded

What the sheet tells the GC:

  1. Bid A carries 1,550 SF less carpet tile than the net measured quantity, before any waste. That is about 6.8 percent of the area. The question back to Bidder A is which rooms it left out.
  2. Bid B looks high, but its quantities equal our net plus the 8 percent waste it states (22,950 SF times 1.08 is 24,786 SF, rounded to 24,800). It is the only bid that covers the whole floor.
  3. Bid C excludes base. Unless the painting bid or your own scope picks it up, 3,860 LF of base belongs to nobody.
  4. Two of three bidders exclude moisture mitigation. If you award to either, you need a plug number or an allowance, and you set it, not us.

How a leveling job moves

  1. You send the package. Drawings, specs, addenda, and every bid you want leveled for the trade, with your bid form if you use one.
  2. We confirm the scope. Which spec sections and which areas belong to the package, and which items you are carrying yourself, before anyone measures.
  3. We take off the trade. Measured from the drawings, with net and waste carried separately, and every quantity tied to its sheet.
  4. We level the bids. Each bid entered against the same scope lines: quantities where the bidder states them, inclusions, exclusions, qualifications, alternates and unit prices. Then the interface checklist.
  5. Review before delivery. Jesse Byrd, our founder, reviews every set before it goes back to you.
  6. You get the sheet and the questions. The leveling sheet, our takeoff, and a short list of questions to send each bidder, ranked by how much they move the number.

We do not choose the subcontractor, call your bidders or negotiate for you. You own the award.

Field verification before you buy out

In Palm Beach County we can measure the site in person. On renovation and tenant improvement work, where the drawings show the building as it was designed rather than as it stands, a field check before award lets you level bids against the real room sizes. We record existing conditions, measure the rooms that drive the package, and list where the field differs from the plans. Field visits start at $200 per site visit. Outside Palm Beach County we work from the drawings only. More on field verification in Palm Beach County.

Takeoff services for general contractors and the alternatives

Each option below is the right answer for somebody. These are categories, not named firms, and the cells describe how each option is structured.

Option What you get Who reads the specs and addenda against the bids Scope gaps across trades Field check Best for
Your own precon estimators Your standards, your history with each sub Your estimators Your estimators, when they have the hours Yes, if someone can get to site GCs with steady volume and estimators who know the finish trades
Level on the bids alone A price comparison of what each sub sent Nobody independent of the bidders Found only if a bidder points it out No Small packages with trusted subs on a repeat building type
Bid leveling software Line items from each bid normalized into one sheet Your team, in the software Flags missing line items it can match; someone still reads the documents No Teams whose bids already come in on a common bid form
Full service estimating firms, US or offshore All trades quantities and often pricing; varies by firm, ask who does the work and where The firm's estimators Varies by firm; ask for a sample Varies; ask GCs who need a priced estimate across every division
Free takeoffs from a flooring dealer or mill Flooring quantities from a supplier, tied to its product The supplier's estimator, for its own product Flooring only Varies by supplier A flooring package where you are comfortable with quantities tied to one supplier's product
Maverick Takeoff Solutions Finish trade quantities, a leveling sheet and the interface checklist, quantity only by default Our estimators, who take off these trades for subcontractors The eleven item checklist on this page, across all four trades Yes, Palm Beach County only, from $200 per site visit GC precon teams buying out flooring, painting, drywall and Division 8 packages
Illustration: a sunlit lobby lounge with oak shelving, a stone wall, a linen sofa and a round oak table on a jute rug.

What we do not do for general contractors

We do not produce an all trades priced estimate, conceptual budgets or GMP pricing for an owner. We do not take off structure, sitework, concrete, MEP or HVAC. We do not add material pricing to a takeoff unless you ask. We do not choose subcontractors or speak to your bidders. We do not give legal advice on subcontract terms; a subcontract review from us is a commercial risk review only. If your need is one of these, the comparison above names the better option.

Who does the work

Every Maverick estimator is US based. The same estimators who take off flooring, painting, drywall and Division 8 for subcontractors do the GC work. Flooring is measured in MeasureSquare, door, frame and hardware entry is supported in Comsense, and deliverables come as color coded PDF plans and an Excel quantity report, with the native MeasureSquare files on flooring.

Subcontractors who send us their work include WorkScapes, Consolidated Flooring, United Contract Flooring, L. Cox Flooring and IHC Specialty Services.

AI assisted document analysis helps us find the sheets and spec sections that matter faster. AI assists our estimators; it does not replace them. A person measures the job and a person reads the bids.

Turnaround and price

Standard turnaround is 3 business days from complete documents. For bid leveling, complete documents means the drawings, specs, addenda and every bid you want leveled. Rush is quoted per job.

Flooring takeoffs are $0.0125 per SF with a $125 project minimum; on a building with repeated identical layouts, the typical unit is counted once, not each copy. Painting, drywall and Division 8 takeoffs, bid leveling and scope gap review are quoted per project. What drives the quote: the number of sheets and areas in the package, how many trades and how many bids you want leveled, the addenda issued so far, the opening count and hardware set count on Division 8, and how close the bid date is. The full pricing model is on the pricing page.

If we measured something wrong or missed something on the drawings we were given, we correct it at no charge. A new addendum, ASI, bulletin, revised drawing set or a change to the package scope is billable, and we quote it before we start. The full policy is on how we work.

See how a package moves from intake to delivery.

What you receive

  • The leveling sheet
  • Our takeoff
  • A short list of questions to send each bidder

How it is priced

Quoted per project, with the price drivers named.

What sets the price

  • The number of sheets and areas in the package
  • How many trades and how many bids you want leveled
  • The addenda issued so far
  • The opening count and hardware set count on Division 8
  • How close the bid date is

See pricing for every trade

Questions and answers

Do you work for general contractors?

Yes. Maverick Takeoff Solutions is built as an outsourced estimating department for commercial subcontractors, and GC precon teams use the same estimators for trade level takeoffs, bid leveling support, scope gap review and field verification in flooring, painting, drywall and Division 8.

Can you price the whole project?

No. Maverick Takeoff Solutions does not produce an all trades priced estimate or a conceptual budget, and we do not take off structure, sitework, concrete, MEP or HVAC. For that work an in house precon team or a full service estimating firm is the better choice.

What does bid leveling support include?

Maverick Takeoff Solutions puts every bid for a trade on the same scope: quantities against our takeoff where the bidder states them, inclusions, exclusions, qualifications, alternates and unit prices, plus the items no bidder carried. You choose the subcontractor and set any plug numbers.

Do you add your own pricing to the leveling sheet?

Not by default. Maverick Takeoff Solutions takeoffs are quantity only, and the leveling sheet shows each bid as the bidder priced it. If you want pricing support on a package, ask and we scope it separately. You choose the subcontractor and set any plug numbers.

How fast is it?

Standard turnaround for takeoff services for general contractors at Maverick Takeoff Solutions is 3 business days from complete documents. For bid leveling, complete means the drawings, specs, addenda and every bid you want leveled. Rush is quoted per job, and the delivery date is confirmed before work starts.

Can you check the site before we buy out a package?

In Palm Beach County, yes, from $200 per site visit. Maverick Takeoff Solutions measures existing conditions and checks plan versus field before you award. Outside Palm Beach County we work from the drawings only, for general contractors anywhere in the United States.

When should a GC use someone else?

When you need a priced estimate across every division, a conceptual budget for an owner, or quantities for structure and MEP, use someone other than Maverick Takeoff Solutions. If your bids already come in on your own bid form and you only need line items normalized, leveling software may be enough.

Illustration: the lobby in warm evening light, with lamps glowing over the lounge and dining area.

Send the finish package

Send it with the due date, and we confirm scope, price and delivery date in writing before any work starts.