Illustration: a lobby window wall with tall glass doors, an olive tree and trees in autumn color outside.

Scope of work review for subcontractors, written before you price

Maverick Takeoff Solutions writes a scope of work review for subcontractors before pricing: what is in your scope, what sits at the edge and what to exclude, as Above the Line, Below the Line and Exclusions, each line traced to a sheet or spec section. A standalone review is quoted per project; with a flooring takeoff it is $200 flat.

Send an ITB for review

  • 100 percent US based estimators
  • Jesse Byrd reviews every set before delivery
  • Corrections to our work are free; client revisions and new addenda are billable

A scope of work review tells a subcontractor what is in its scope, what sits at the edge, and what to exclude before pricing. Maverick Takeoff Solutions writes it as Above the Line, Below the Line and Exclusions, each line traced to a sheet or spec section. A US based estimator reads the set and Jesse reviews it before delivery.

The short version. Scope analysis covers commercial flooring, painting and wallcovering, drywall, fencing, and doors, frames and hardware, for projects anywhere in the United States, because the work runs on documents. Every estimator who opens your plans is US based, and Jesse reviews every set before delivery. As a standalone review it is quoted per project, and the quote names the drivers: the size of the document set, how many addenda there are and your due date. Ordered with a flooring takeoff, the scope analysis report, bid snapshot included, is a flat $200 per job. Corrections to our work are free.

Send an ITB for scope analysis

Why the scope gets argued after award

Most scope fights are not about quantities. They are about a line nobody wrote down. The finish schedule shows base at the casework and a general note says By Millworker. The flooring section makes the flooring contractor responsible for moisture testing and Division 01 gives it to the owner's testing agency. Addendum 2 adds a stair, and the stair section is in Division 05. If your number is silent on those items, the GC reads the silence one way and you read it the other, and the difference comes out of your margin as a backcharge or a free change.

A scope analysis moves that argument to bid day, when it costs you a question to the GC instead of a change order you cannot collect.

Above the Line, Below the Line, Exclusions

We sort every line in your scope into one of three groups, the same way on every job and every trade.

Group What goes in it What you do with it
Above the Line Work clearly in your scope: shown on your plans, named in your spec sections, carried in your number Price it
Below the Line Work that is adjacent to your scope, ambiguous, or arguably someone else's Ask the GC before bid day, then price it, qualify it or exclude it
Exclusions Work explicitly not included, including items marked By G.C., By Millworker or By Others, listed so it is visible that we saw them Put it on your proposal so the GC sees it in writing

Each line carries the plan sheet or spec section it came from. Open items are ranked: HIGH changes your number, MED changes how you present the bid, INFO is worth knowing. Questions are written so a PM can answer them in one line, for example: "Tag RFT 1 is scheduled in the room finish schedule but does not appear in the finish legend. Please confirm manufacturer and product."

How we decide which line a scope item goes on

This is the test we run on every item that is not obviously yours. You can run it yourself on any bid set, including one somebody else took off.

  1. Is it on your plans and in your spec section, with no note giving it to someone else? Above the Line.
  2. Do two documents disagree about who carries it? For example, the spec section says flooring contractor and Division 01 says owner. Below the Line, with a HIGH question naming both documents.
  3. Is it shown, but only in another trade's section or on another trade's sheet? Below the Line, with a question asking the GC to confirm it is not in your package.
  4. Does a note say By G.C., By Others, By Owner or By another named trade? Exclusions, listed by name, so nobody can say you missed it.
  5. Is it marked TBD, VARIES or missing from the legend? Measured where it can be, marked TBD where it cannot, and put on the question list. We do not guess a product to fill a gap.
  6. Does an alternate add or remove it? Listed under the alternate, not mixed into the base scope.

The verdict on a Below the Line item is yours. You know the GC and how they settle scope. We write down what the documents say and where.

Where scope usually hides, by trade

For example, these are items that often land Below the Line or in Exclusions in the trades we take off. Your documents decide; this is where we look first.

Trade Items that often sit at the edge of your scope Where the answer usually is
Commercial flooring Base at casework, stair treads and nosings on a steel stair, moisture testing and mitigation, floor leveling beyond tolerance, wall tile in toilet rooms General notes, Division 05 stair section, Division 01, the concrete section, the tiling section
Painting and wallcovering Exposed piping and ductwork, factory finished items, wallcovering behind millwork, the finish level the walls are delivered at Painting schedule, mechanical sections, millwork details, the gypsum board section
Drywall Studs and track, in wall blocking for accessories, firestopping at penetrations, access panels supplied by other trades Partition types, rough carpentry section, firestopping section, mechanical and electrical sections
Fencing Post footings, gate operators and access control, removal of existing fence, layout of the fence line Site details, electrical and security sections, demolition plan, general notes
Doors, frames and hardware Installation versus supply only, wiring for electrified hardware, grouting frames in masonry, access control devices Hardware sets, Division 26 and 28 sections, masonry section, the bid form

None of these is always in or always out. Each one is a line to write down, with its source, before your number goes in.

What a scope of work review returns

With every Maverick takeoff. A qualifications and assumptions page set out as Above the Line, Below the Line and Exclusions, with the open items ranked. It is part of the takeoff, not an extra. See how we work for where it sits in the process.

The scope analysis report. About 8 pages for your own office: the bid or no bid snapshot scorecard, commercial terms and schedule, high risk items (poured and resinous systems, long lead, owner furnished, allowances), material schedules and where the plans call out each material, prep and accessories, inclusions and exclusions with By Others named, alternates, what each addendum changed, and questions to confirm with the GC.

For the GC, if you want it. The scope analysis is your internal read. The branded scope of work PDF is the letter that goes to the GC under your name, a flat $175 per job on flooring takeoffs on our add on menu, so you do not pay twice for the same thing.

Scope analysis, bid review and contract review: which one you need

Three reviews read the same bid set and answer three different questions. They are often ordered together, and the same team can run all three from one upload.

Review The question it answers When to order it What comes back
ITB and bid review Should we bid this at all? Before anyone starts the takeoff A one page Bid Snapshot: go, go with conditions or no go, with the reasons
Scope analysis What exactly are we pricing, and what are we leaving out? Once you have decided to bid, before the number goes in Above the Line, Below the Line and Exclusions, each traced to a sheet or section, with ranked questions
Contract commercial risk review What are we agreeing to if we sign? When the subcontract or GC terms arrive, before you sign The clauses that carry cost or risk, with article numbers. A commercial risk review, not legal advice
Takeoff How much material and labor scope is there? Once you have decided to bid Quantities on color coded PDF plans and an Excel quantity report

Scope analysis does not interpret the contract. That belongs to the contract review, and anything that worries you there belongs with your attorney.

When an addendum lands after the scope analysis, the addendum and revision analysis shows what changed for your trade. A new addendum is client driven scope: billable and quoted before work starts.

Ways to check your scope before bid day, compared

Option What it is Strengths Limits Best for
Your own estimator or PM The person pricing the job reads the scope as they go Knows your crews, your GC and how they settle scope Scope review happens in the margins of the takeoff, so it gets thin when bid season is busy Shops with estimator time to spare and simple documents
The GC's scope sheet or bid form The scope list the GC issues with the invitation Free, and it is the GC's own words Written from the GC's side. It rarely lists what is ambiguous, and it does not trace items to sheets A starting point on every bid; read it against the documents, not instead of them
A takeoff service that sends quantities only Plans in, quantities out Quantities without your estimator's hours Counts what is shown without asking whose it is, so edge items are counted, dropped or missed silently Jobs where scope is simple and you already know the GC
Maverick scope analysis A US based estimator reads the full set and writes Above the Line, Below the Line and Exclusions with sources Every edge item written down with a sheet or section, ranked questions ready to send, and the takeoff available from the same documents You still own the decision on each Below the Line item, and we know less about your GC than you do, so we ask. Not legal advice and not a cost estimate Commercial subs bidding flooring, painting, drywall, fencing, or doors, frames and hardware, with more bids than estimator hours
Illustration: a large linen drum pendant over a lobby lounge, with oak shelving and a dining area beyond.

How a scope analysis works

  1. Send the bid set. Upload the drawings, project manual, addenda, the GC's scope sheet and any subcontract or scope exhibit through the request form. Tell us your trade and anything you already know about the GC.
  2. We confirm in writing. Scope, price and delivery date are confirmed in writing before we start.
  3. We read and sort. A US based estimator reads your trade's plans, finish schedules, spec sections, Division 01, general and keyed notes, alternates and addenda, and sorts every line into Above the Line, Below the Line or Exclusions with its source.
  4. Jesse reviews it. Jesse reviews every set before delivery.
  5. You get the report and the questions. Delivered to your client portal or a restricted folder. Send the HIGH questions to the GC before the RFI cutoff.

What it costs

A standalone scope analysis is quoted per project before we start, and the quote names what drives it: the size of the document set, how many addenda there are and your due date. Ordered with a flooring takeoff, the scope analysis report, bid snapshot included, is a flat $200 per job. The Above the Line, Below the Line and Exclusions page that comes with every takeoff costs nothing extra.

Corrections to our work are free. Client driven revisions and new addenda are billable and quoted before work starts. See pricing for takeoff rates and monthly accounts.

Preconstruction Intelligence. Bid review, spec review, addendum analysis, scope analysis and subcontract risk review, from one team and one upload.

Specification review. The requirements in your spec sections that change price, read before the takeoff.

Commercial flooring takeoff and doors, frames and hardware takeoff. Where scope analysis is used most: finish schedules full of By Others notes, and hardware sets where supply and install split.

Scope analysis is one part of the outsourced estimating department Maverick runs for commercial subcontractors.

Send an ITB for scope analysis

What you receive

  • Above the Line, Below the Line and Exclusions
  • Open items ranked HIGH, MED and INFO
  • Bid or no bid snapshot scorecard
  • Commercial terms and schedule
  • Where the plans call out each material
  • What each addendum changed

How it is priced

Quoted per project, with the price drivers named.

What sets the price

  • The size of the document set
  • How many addenda there are
  • Your due date

See pricing for every trade

Questions and answers

What is a scope of work review for a subcontractor?

It is a read of the bid set that tells you what is in your scope, what sits at the edge of it, and what to exclude before you price. Maverick writes it as Above the Line, Below the Line and Exclusions, each line traced to a plan sheet or spec section, with ranked questions for the GC.

What do Above the Line, Below the Line and Exclusions mean?

Above the Line is work clearly in your scope, so you price it. Below the Line is work that is adjacent, ambiguous or arguably someone else's, so you ask the GC before bid day. Exclusions are items you are not carrying, including anything marked By G.C. or By Others, listed so the GC sees them in writing.

How is scope analysis different from a bid review or a contract review?

A bid review answers whether to bid at all, before the takeoff starts. Scope analysis answers what exactly you are pricing and leaving out once you decide to bid. A contract commercial risk review reads the subcontract terms before you sign; it is not legal advice. One upload to Maverick Takeoff Solutions can feed all three.

What does a scope analysis cost?

A standalone scope of work review from Maverick Takeoff Solutions is quoted per project, and the quote names the drivers: document set size, number of addenda and your due date. With a flooring takeoff, the scope analysis report and bid snapshot are a flat $200 per job; other trades are quoted per project. Corrections to our work are free.

Do I send the scope analysis to the GC?

No. The Maverick Takeoff Solutions scope analysis is your internal read, and it can say things you would not put on a proposal. Your scope letter goes to the GC. If you want that written for you, the branded scope of work PDF is a flat $175 per job on flooring takeoffs, on our add on menu.

What do you need from me to start a scope analysis?

The drawings, the project manual or specifications, every addendum issued so far, and the GC's scope sheet or bid form if there is one. Send Maverick Takeoff Solutions the subcontract or scope exhibit too if you have it, because that is where edge items get pulled into your scope. Tell us your trade and what you know about the GC.

When should I not pay for a scope analysis?

When the set is small and clean, your estimator has the hours, and you know how this GC settles scope, your own read may be enough. If your question is legal, such as whether a clause is enforceable, talk to a construction attorney. And if your trade is not one Maverick Takeoff Solutions takes off, use a specialist in it.

Illustration: the lobby in warm evening light, with lamps glowing over the lounge and dining area.

Send the ITB

Send it with the due date, and we confirm scope, price and delivery date in writing before any work starts.

Send an ITB for review