

Free flooring takeoffs from your dealer vs outsourced ones
A free flooring takeoff from a dealer, distributor or mill is paid for by the material order it helps win, so it is built on that supplier's products. Maverick Takeoff Solutions charges $0.0125 per SF, $125 minimum, for a takeoff built for your bid: any product, alternates, addenda and other trades. Use the free one when you buy from them.
I run Maverick Takeoff Solutions, an outsourced takeoff and estimating department, so I sell one of the two options on this page. Nothing here is ranked. Every statement about suppliers or other firms comes from a public page, with the date we read it, and where a fact is not published we say "not published". Each source is named and linked on the page. If a supplier shows us something here is wrong, tell us through the contact page and we will fix it and note the change. Third party facts last checked .
Your distributor already does your takeoffs and does not charge. Our standard turnaround is 3 business days from complete documents; rush is quoted per job.
Best for. Maverick fits subs who bid one job to several GCs, price alternates or approved equals, carry painting, drywall, fencing or doors frames and hardware alongside flooring, or need the field measured in Palm Beach County. If you will buy the specified product from one supplier on a straight install, keep the free takeoff.
Why pay when a free flooring takeoff is on the table
The dealer down the road will do one too, and on bigger spec'd jobs the mill rep may offer one through the distributor. None of them charge, so the fair question is why anyone would pay for a takeoff.
The answer is not that the free takeoff is bad. A supplier's estimator can measure a plan as well as anyone, and knows its own roll widths, carton sizes and lead times better than we do. The difference is who the takeoff is for. A supplier's takeoff exists to quote that supplier's material. Your bid takeoff exists to price your scope. On a straight install of the specified product, those line up. This page is about the times they do not.
What a supplier takeoff is, from the sources
We read what the public record says about supplier takeoffs on 2026.11.12. Very little is written down, which is itself worth knowing: we found no supplier or mill page that publishes the terms of its free takeoff (what it covers, who reruns it, what you can see).
| Source (read 2026.11.12) | What it says | What it tells a buyer |
|---|---|---|
| ConstructConnect, Takeoff as a Service, a takeoff service vendor | Sells takeoffs to "suppliers or distributors who offer takeoff to win material orders", and describes suppliers "maybe already doing takeoffs for free to win orders" | The free takeoff is a sales cost the supplier carries to win the order. Some suppliers have a third party produce it. |
| Ruh.AI, flooring distributors page, an AI takeoff tool vendor | Describes flooring takeoff for distributors as turning "a flooring contractor's finish plans into the material a distributor quotes", priced off the distributor's list; lists seam plans and roll cuts among what it does not do | The output is a material quote on one list. Some distributor takeoffs are produced with software tools, and seam plans may still sit with your team or the installer. |
| D and G Flooring, flooring estimating guide (dated 2026.05.07), a flooring contractor | States that some manufacturers offer free takeoff and quoting through their distributor networks on spec'd commercial projects above a dollar threshold, and that the estimate ties you to their product | Mill programs exist, per one contractor's account. We could not find any mill describing such a program on its own site on 2026.11.12, so we do not name mills here. |
"Not published" on any of these pages means we did not find it on that date, not that the supplier does not do it. Ask.
Side by side
The table compares models, not companies. Cells quote the sources above where one exists; where nothing is published we say so, and the answer for your supplier is whatever it puts in writing.
| Option | What you pay | Whose product the quantity is built on | Addenda and revisions | Scope beyond flooring | Field verification | What you can check | Best for |
|---|---|---|---|---|---|---|---|
| Distributor or dealer takeoff | Nothing for the takeoff; carried by the material order (ConstructConnect) | That supplier's products, priced off its list (Ruh.AI) | Not published; ask who reruns it and how fast | The products that supplier quotes | Not published; ask | Varies; ask for the marked up plan and the waste factor | A straight install of the specified product you will buy from that supplier, checked by your estimator |
| Mill or manufacturer program through a distributor | Nothing for the takeoff, on spec'd projects above a dollar threshold (D and G Flooring guide) | That manufacturer's product; the estimate "ties you to their product" (D and G Flooring guide) | Not published; ask | That manufacturer's product lines | Not published; ask | Varies; ask | A large spec'd job where that mill's product is the basis of design and no substitution is likely |
| Supplier takeoff produced by a third party for the supplier | Nothing to you; the supplier pays the service (ConstructConnect) | The supplier's quote | Set by the supplier's arrangement; ask | The products the supplier quotes | Not published | Varies; ask | Same as a distributor takeoff; the supplier owns the relationship |
| Your own estimator in house | Salary and software seat | Yours; any product | Your estimator, on your schedule | Whatever your estimator carries | Your people, if you send them | Everything | Steady volume with an estimator who has time to spare |
| Maverick Takeoff Solutions, outsourced takeoff department | Paid. Flooring $0.0125 per SF of floor taken off, with a $125 project minimum; identical repeated layouts counted once; other trades quoted per project | Yours; quantities by finish tag, product neutral, quantity only by default | Corrections to our work free; client driven revisions and addenda quoted before work starts | Painting and wallcovering, drywall, fencing, doors frames and hardware; bid review and scope analysis | In person in Palm Beach County only, from $200 per site visit | Color coded PDF plans, an Excel quantity report and the native MeasureSquare files, net and waste shown separately | Subs who bid one job to several GCs, price alternates, carry more than flooring, or have no estimator with time to check |
Two of the five rows beat Maverick on price for every job, and the supplier rows beat us on knowing their own product. Where we win is when the job does not fit one supplier's quote.
One finish schedule, two takeoffs
For example, take a tenant improvement with three finishes: CPT-1 carpet tile specified as one mill's product "or approved equal", LVT-1 in the corridors, and RB-1 rubber base throughout. This is an illustration, not a real job.
| Item | Supplier takeoff | Independent bid takeoff |
|---|---|---|
| CPT-1 | Cartons of that supplier's tile, waste built in | Net SF by room, waste shown as its own line, so any approved equal can be priced from the same quantity |
| LVT-1 | Cartons of the product on its list | Net SF by room and waste, plus the transition count where LVT meets CPT |
| RB-1 | LF of its base, possibly with adhesive | LF by room, inside and outside corners if your shop prices them |
| Prep, transitions, sundries | Whatever the supplier sells | Counted against the finish schedule and the spec, with assumptions written down |
| Addendum 2 changes CPT-1 to broadloom | A new quote when the supplier reruns it | A delta: which rooms changed, the new SY on the specified roll width, what came off |
A 12 foot roll and a 13 foot 6 inch roll lay out differently in the same room, so the SY you order changes with the product. A takeoff built on one supplier's roll answers that supplier's question. A takeoff built on the finish tag lets you answer it for each supplier you ask to quote.
Nine questions to ask before you bid off a supplier takeoff
These work on any supplier, and on us.
- Can I see the marked up plan? A quantity you cannot trace to a room is a number you cannot defend.
- Is it measured by finish tag or by your product? By tag lets you price alternates. By product does not.
- What waste factor did you use, and is net shown separately? An order quantity and a bid quantity are different numbers.
- Are base, transitions, prep and sundries counted, and against which spec section?
- Which addenda, ASIs and bulletins does it include? Get the list in writing.
- Who reruns it when the next addendum drops, and how fast? Ask before bid week, not during it.
- Will the same takeoff go to the other subs bidding this job? If every bidder has the same quantity, your number only differs on price and labor.
- Does the quote hold if the GC accepts an approved equal or value engineers the floor?
- Has anyone checked the plan against the building? On renovation and existing building work, the drawing is not always the room.
If you get clear answers to all nine, the free takeoff is doing its job. If you do not, that is the gap an independent takeoff fills.
When the free takeoff is the right call
Use it when the job is a straight install of the specified product, you will buy from that supplier anyway, there are no alternates to price, and you or your estimator check the takeoff before it goes into the number. In that case paying us adds cost without changing the bid. Keep the relationship; a good distributor is worth more to your business than any takeoff.
When an independent takeoff earns its cost on the bid
You bid the same job to several GCs and want one quantity you own. The spec says "or approved equal" and you want to price two or three products from the same numbers. You want to send one quantity to more than one supplier and compare their quotes. The addendum lands two days before bid and you need to know what changed by room. The job includes painting, drywall or doors frames and hardware, and you want one team on the whole package. Or there is no one in your office with time to check a supplier's takeoff before bid day.
An independent quantity also keeps the supplier conversation where it belongs: you ask for material prices on your numbers, not on theirs.

Where Maverick does not compete
We are not free, and on a single straight install we will never beat a takeoff that costs you nothing. We do not price material by default, so you still need your suppliers' quotes. We do not know any supplier's stock, lead times or freight better than the supplier does. Field verification is Palm Beach County only; everywhere else, our takeoffs note where the plan needs checking in the field so you know where the risk sits.
What you get from Maverick
Quantities in SF, SY, LF and each counts by finish tag and by room, on color coded PDF plans, with an Excel quantity report and the native MeasureSquare files. Net and waste on separate lines. A qualifications page that lists assumptions and what sits Above the Line, Below the Line and in Exclusions. See the flooring takeoff services page for the full flooring scope.
Jesse Byrd, our founder, reviews every set before delivery.
Corrections to our own work at no charge. Client driven revisions and new addenda quoted before we start, and handled as a delta report. Standard turnaround is 3 business days from complete documents; rush is quoted per job. Our estimators are US based. AI assists our estimators with document review; it does not replace them.
Before the takeoff, we can tell you whether the job is worth bidding at all: bid review.
To send one quantity to several suppliers, order the vendor RFQ workbook with the takeoff: one tab per manufacturer, quantities with waste, sundries calculated from coverage rates, unconfirmed products flagged, a flat $125 per job. It is on our add on menu with the import workbook ($75), the branded scope of work PDF ($175) and the bundle of all three ($325).
When the quotes come back, quote leveling lines up to four of them against our quantities, with exclusions and gaps flagged, for $100 per package. Both sit under our procurement support for subcontractors.
In Palm Beach County, we measure the site in person before you order: flooring field measures, from $200 per site visit.
Commercial flooring clients include WorkScapes, Consolidated Flooring, United Contract Flooring and L. Cox Flooring.
If you are the dealer or distributor
Some of the people reading this give takeoffs away. If your counter is short on estimators in bid season, we can be the overflow. We return quantities by finish tag in the format your shop prices from; your team prices them off your list and sends the quote under your name. Pricing follows the same model as above.
Related pages
- Thinking about hiring instead? See what a full time estimator costs per bid
- Weighing an offshore takeoff shop? Read US based vs offshore estimating
- How a bid set moves through our team, step by step: how we work
- Every comparison we have written, in one place
See what a paid takeoff costs before you send anything.
Best for
- Distributor or dealer takeoffdealer or mill
- A straight install of the specified product you will buy from that supplier, checked by your estimator
- Mill or manufacturer program through a distributordealer or mill
- A large spec'd job where that mill's product is the basis of design and no substitution is likely
- Supplier takeoff produced by a third party for the supplierdealer or mill
- Same as a distributor takeoff; the supplier owns the relationship
- Your own estimator in housein house
- Steady volume with an estimator who has time to spare
- Maverick Takeoff Solutionsoutsourced takeoff department
- Subs who bid one job to several GCs, price alternates, carry more than flooring, or have no estimator with time to check
Sources
Questions and answers
Is a free takeoff from my flooring distributor really free?
You pay nothing for the takeoff itself. The cost is carried by the material order the takeoff is meant to win, which is why the quantities are built on that supplier's products and its list. That is a fair trade when you plan to buy from that supplier anyway.
Can I bid a job off the supplier's takeoff?
Yes, if you check it first. Ask for the marked up plan, confirm the takeoff follows the finish schedule tag by tag, see net quantities and waste separately, and confirm base, transitions, prep and sundries are counted. If the supplier will not show the plan, you are bidding a number you cannot check.
What happens to a supplier takeoff when an addendum changes the finish schedule?
It depends on the supplier. Ask in writing who reruns it, how fast, and whether you get only what changed or a whole new number. An independent takeoff department such as Maverick Takeoff Solutions treats the addendum as its own job: a delta by room and by item, quoted before work starts.
Does an outsourced takeoff include material pricing?
Not at Maverick, unless you ask. Our takeoffs are quantity only by default: SF, SY, LF and each counts by finish tag. You still get material pricing from your suppliers, and with an independent quantity you can send the same numbers to more than one of them.
How much does an outsourced flooring takeoff cost, and how long does it take?
Maverick Takeoff Solutions charges $0.0125 per SF of floor taken off, $125 project minimum, and counts an identical repeated layout once. Other trades are quoted per project on sheet count, finish or opening count and addenda. The vendor RFQ workbook is a $125 add on. Standard turnaround is 3 business days from complete documents; rush is quoted per job.
When should I use the free takeoff instead of Maverick?
When the job is a straight install of the specified product, you will buy from that supplier anyway, there are no alternates to price, and you or your estimator check the takeoff before it goes into the number. In that case paying Maverick Takeoff Solutions adds cost without changing the bid.
Can a flooring dealer or distributor use Maverick for the takeoffs it gives away?
Yes. A dealer or distributor counter that gives takeoffs to its contractor customers can send the overflow to Maverick Takeoff Solutions. We return quantities by finish tag, and your team prices them off your list and sends the quote under your name. Standard turnaround is 3 business days from complete documents; rush is quoted per job.
Why is Maverick writing a comparison it is part of?
Because a free supplier takeoff is a real alternative to paying Maverick Takeoff Solutions, and the buyer deserves the full picture. We state where the free takeoff is the better choice, name and link every outside source with the date we read it, and fix anything a supplier shows us is wrong.

Send the bid set
Send the bid set and the due date, and the quantities come back in 3 business days from complete documents; rush is quoted per job.
