Illustration: a linen sofa and a round oak table on a jute rug over a polished stone floor.Illustration: a pale oak plank resting on a travertine tile sample.

Free flooring takeoffs from your dealer vs outsourced ones

A free flooring takeoff from a dealer, distributor or mill is paid for by the material order it helps win, so it is built on that supplier's products. Maverick Takeoff Solutions charges $0.0125 per SF, $125 minimum, for a takeoff built for your bid: any product, alternates, addenda and other trades. Use the free one when you buy from them.

I run Maverick Takeoff Solutions, an outsourced takeoff and estimating department, so I sell one of the two options on this page. Nothing here is ranked. Every statement about suppliers or other firms comes from a public page, with the date we read it, and where a fact is not published we say "not published". Each source is named and linked on the page. If a supplier shows us something here is wrong, tell us through the contact page and we will fix it and note the change. Third party facts last checked .

Your distributor already does your takeoffs and does not charge. Our standard turnaround is 3 business days from complete documents; rush is quoted per job.

Best for. Maverick fits subs who bid one job to several GCs, price alternates or approved equals, carry painting, drywall, fencing or doors frames and hardware alongside flooring, or need the field measured in Palm Beach County. If you will buy the specified product from one supplier on a straight install, keep the free takeoff.

Send one bid set and compare

Why pay when a free flooring takeoff is on the table

The dealer down the road will do one too, and on bigger spec'd jobs the mill rep may offer one through the distributor. None of them charge, so the fair question is why anyone would pay for a takeoff.

The answer is not that the free takeoff is bad. A supplier's estimator can measure a plan as well as anyone, and knows its own roll widths, carton sizes and lead times better than we do. The difference is who the takeoff is for. A supplier's takeoff exists to quote that supplier's material. Your bid takeoff exists to price your scope. On a straight install of the specified product, those line up. This page is about the times they do not.

What a supplier takeoff is, from the sources

We read what the public record says about supplier takeoffs on 2026.11.12. Very little is written down, which is itself worth knowing: we found no supplier or mill page that publishes the terms of its free takeoff (what it covers, who reruns it, what you can see).

Source (read 2026.11.12)What it saysWhat it tells a buyer
ConstructConnect, Takeoff as a Service, a takeoff service vendorSells takeoffs to "suppliers or distributors who offer takeoff to win material orders", and describes suppliers "maybe already doing takeoffs for free to win orders"The free takeoff is a sales cost the supplier carries to win the order. Some suppliers have a third party produce it.
Ruh.AI, flooring distributors page, an AI takeoff tool vendorDescribes flooring takeoff for distributors as turning "a flooring contractor's finish plans into the material a distributor quotes", priced off the distributor's list; lists seam plans and roll cuts among what it does not doThe output is a material quote on one list. Some distributor takeoffs are produced with software tools, and seam plans may still sit with your team or the installer.
D and G Flooring, flooring estimating guide (dated 2026.05.07), a flooring contractorStates that some manufacturers offer free takeoff and quoting through their distributor networks on spec'd commercial projects above a dollar threshold, and that the estimate ties you to their productMill programs exist, per one contractor's account. We could not find any mill describing such a program on its own site on 2026.11.12, so we do not name mills here.

"Not published" on any of these pages means we did not find it on that date, not that the supplier does not do it. Ask.

Side by side

The table compares models, not companies. Cells quote the sources above where one exists; where nothing is published we say so, and the answer for your supplier is whatever it puts in writing.

OptionWhat you payWhose product the quantity is built onAddenda and revisionsScope beyond flooringField verificationWhat you can checkBest for
Distributor or dealer takeoffNothing for the takeoff; carried by the material order (ConstructConnect)That supplier's products, priced off its list (Ruh.AI)Not published; ask who reruns it and how fastThe products that supplier quotesNot published; askVaries; ask for the marked up plan and the waste factorA straight install of the specified product you will buy from that supplier, checked by your estimator
Mill or manufacturer program through a distributorNothing for the takeoff, on spec'd projects above a dollar threshold (D and G Flooring guide)That manufacturer's product; the estimate "ties you to their product" (D and G Flooring guide)Not published; askThat manufacturer's product linesNot published; askVaries; askA large spec'd job where that mill's product is the basis of design and no substitution is likely
Supplier takeoff produced by a third party for the supplierNothing to you; the supplier pays the service (ConstructConnect)The supplier's quoteSet by the supplier's arrangement; askThe products the supplier quotesNot publishedVaries; askSame as a distributor takeoff; the supplier owns the relationship
Your own estimator in houseSalary and software seatYours; any productYour estimator, on your scheduleWhatever your estimator carriesYour people, if you send themEverythingSteady volume with an estimator who has time to spare
Maverick Takeoff Solutions, outsourced takeoff departmentPaid. Flooring $0.0125 per SF of floor taken off, with a $125 project minimum; identical repeated layouts counted once; other trades quoted per projectYours; quantities by finish tag, product neutral, quantity only by defaultCorrections to our work free; client driven revisions and addenda quoted before work startsPainting and wallcovering, drywall, fencing, doors frames and hardware; bid review and scope analysisIn person in Palm Beach County only, from $200 per site visitColor coded PDF plans, an Excel quantity report and the native MeasureSquare files, net and waste shown separatelySubs who bid one job to several GCs, price alternates, carry more than flooring, or have no estimator with time to check

Two of the five rows beat Maverick on price for every job, and the supplier rows beat us on knowing their own product. Where we win is when the job does not fit one supplier's quote.

One finish schedule, two takeoffs

For example, take a tenant improvement with three finishes: CPT-1 carpet tile specified as one mill's product "or approved equal", LVT-1 in the corridors, and RB-1 rubber base throughout. This is an illustration, not a real job.

ItemSupplier takeoffIndependent bid takeoff
CPT-1Cartons of that supplier's tile, waste built inNet SF by room, waste shown as its own line, so any approved equal can be priced from the same quantity
LVT-1Cartons of the product on its listNet SF by room and waste, plus the transition count where LVT meets CPT
RB-1LF of its base, possibly with adhesiveLF by room, inside and outside corners if your shop prices them
Prep, transitions, sundriesWhatever the supplier sellsCounted against the finish schedule and the spec, with assumptions written down
Addendum 2 changes CPT-1 to broadloomA new quote when the supplier reruns itA delta: which rooms changed, the new SY on the specified roll width, what came off

A 12 foot roll and a 13 foot 6 inch roll lay out differently in the same room, so the SY you order changes with the product. A takeoff built on one supplier's roll answers that supplier's question. A takeoff built on the finish tag lets you answer it for each supplier you ask to quote.

Nine questions to ask before you bid off a supplier takeoff

These work on any supplier, and on us.

  1. Can I see the marked up plan? A quantity you cannot trace to a room is a number you cannot defend.
  2. Is it measured by finish tag or by your product? By tag lets you price alternates. By product does not.
  3. What waste factor did you use, and is net shown separately? An order quantity and a bid quantity are different numbers.
  4. Are base, transitions, prep and sundries counted, and against which spec section?
  5. Which addenda, ASIs and bulletins does it include? Get the list in writing.
  6. Who reruns it when the next addendum drops, and how fast? Ask before bid week, not during it.
  7. Will the same takeoff go to the other subs bidding this job? If every bidder has the same quantity, your number only differs on price and labor.
  8. Does the quote hold if the GC accepts an approved equal or value engineers the floor?
  9. Has anyone checked the plan against the building? On renovation and existing building work, the drawing is not always the room.

If you get clear answers to all nine, the free takeoff is doing its job. If you do not, that is the gap an independent takeoff fills.

When the free takeoff is the right call

Use it when the job is a straight install of the specified product, you will buy from that supplier anyway, there are no alternates to price, and you or your estimator check the takeoff before it goes into the number. In that case paying us adds cost without changing the bid. Keep the relationship; a good distributor is worth more to your business than any takeoff.

When an independent takeoff earns its cost on the bid

You bid the same job to several GCs and want one quantity you own. The spec says "or approved equal" and you want to price two or three products from the same numbers. You want to send one quantity to more than one supplier and compare their quotes. The addendum lands two days before bid and you need to know what changed by room. The job includes painting, drywall or doors frames and hardware, and you want one team on the whole package. Or there is no one in your office with time to check a supplier's takeoff before bid day.

An independent quantity also keeps the supplier conversation where it belongs: you ask for material prices on your numbers, not on theirs.

Illustration: a lobby dining area beside floor to ceiling glass doors, with trees in autumn color outside.

Where Maverick does not compete

We are not free, and on a single straight install we will never beat a takeoff that costs you nothing. We do not price material by default, so you still need your suppliers' quotes. We do not know any supplier's stock, lead times or freight better than the supplier does. Field verification is Palm Beach County only; everywhere else, our takeoffs note where the plan needs checking in the field so you know where the risk sits.

What you get from Maverick

Quantities in SF, SY, LF and each counts by finish tag and by room, on color coded PDF plans, with an Excel quantity report and the native MeasureSquare files. Net and waste on separate lines. A qualifications page that lists assumptions and what sits Above the Line, Below the Line and in Exclusions. See the flooring takeoff services page for the full flooring scope.

Jesse Byrd, our founder, reviews every set before delivery.

Corrections to our own work at no charge. Client driven revisions and new addenda quoted before we start, and handled as a delta report. Standard turnaround is 3 business days from complete documents; rush is quoted per job. Our estimators are US based. AI assists our estimators with document review; it does not replace them.

Before the takeoff, we can tell you whether the job is worth bidding at all: bid review.

To send one quantity to several suppliers, order the vendor RFQ workbook with the takeoff: one tab per manufacturer, quantities with waste, sundries calculated from coverage rates, unconfirmed products flagged, a flat $125 per job. It is on our add on menu with the import workbook ($75), the branded scope of work PDF ($175) and the bundle of all three ($325).

When the quotes come back, quote leveling lines up to four of them against our quantities, with exclusions and gaps flagged, for $100 per package. Both sit under our procurement support for subcontractors.

In Palm Beach County, we measure the site in person before you order: flooring field measures, from $200 per site visit.

Commercial flooring clients include WorkScapes, Consolidated Flooring, United Contract Flooring and L. Cox Flooring.

If you are the dealer or distributor

Some of the people reading this give takeoffs away. If your counter is short on estimators in bid season, we can be the overflow. We return quantities by finish tag in the format your shop prices from; your team prices them off your list and sends the quote under your name. Pricing follows the same model as above.

Talk about overflow takeoffs for your counter

Best for

Distributor or dealer takeoffdealer or mill
A straight install of the specified product you will buy from that supplier, checked by your estimator
Mill or manufacturer program through a distributordealer or mill
A large spec'd job where that mill's product is the basis of design and no substitution is likely
Supplier takeoff produced by a third party for the supplierdealer or mill
Same as a distributor takeoff; the supplier owns the relationship
Your own estimator in housein house
Steady volume with an estimator who has time to spare
Maverick Takeoff Solutionsoutsourced takeoff department
Subs who bid one job to several GCs, price alternates, carry more than flooring, or have no estimator with time to check

Sources

Questions and answers

Is a free takeoff from my flooring distributor really free?

You pay nothing for the takeoff itself. The cost is carried by the material order the takeoff is meant to win, which is why the quantities are built on that supplier's products and its list. That is a fair trade when you plan to buy from that supplier anyway.

Can I bid a job off the supplier's takeoff?

Yes, if you check it first. Ask for the marked up plan, confirm the takeoff follows the finish schedule tag by tag, see net quantities and waste separately, and confirm base, transitions, prep and sundries are counted. If the supplier will not show the plan, you are bidding a number you cannot check.

What happens to a supplier takeoff when an addendum changes the finish schedule?

It depends on the supplier. Ask in writing who reruns it, how fast, and whether you get only what changed or a whole new number. An independent takeoff department such as Maverick Takeoff Solutions treats the addendum as its own job: a delta by room and by item, quoted before work starts.

Does an outsourced takeoff include material pricing?

Not at Maverick, unless you ask. Our takeoffs are quantity only by default: SF, SY, LF and each counts by finish tag. You still get material pricing from your suppliers, and with an independent quantity you can send the same numbers to more than one of them.

How much does an outsourced flooring takeoff cost, and how long does it take?

Maverick Takeoff Solutions charges $0.0125 per SF of floor taken off, $125 project minimum, and counts an identical repeated layout once. Other trades are quoted per project on sheet count, finish or opening count and addenda. The vendor RFQ workbook is a $125 add on. Standard turnaround is 3 business days from complete documents; rush is quoted per job.

When should I use the free takeoff instead of Maverick?

When the job is a straight install of the specified product, you will buy from that supplier anyway, there are no alternates to price, and you or your estimator check the takeoff before it goes into the number. In that case paying Maverick Takeoff Solutions adds cost without changing the bid.

Can a flooring dealer or distributor use Maverick for the takeoffs it gives away?

Yes. A dealer or distributor counter that gives takeoffs to its contractor customers can send the overflow to Maverick Takeoff Solutions. We return quantities by finish tag, and your team prices them off your list and sends the quote under your name. Standard turnaround is 3 business days from complete documents; rush is quoted per job.

Why is Maverick writing a comparison it is part of?

Because a free supplier takeoff is a real alternative to paying Maverick Takeoff Solutions, and the buyer deserves the full picture. We state where the free takeoff is the better choice, name and link every outside source with the date we read it, and fix anything a supplier shows us is wrong.

Illustration: the lobby in warm evening light, with lamps glowing over the lounge and dining area.

Send the bid set

Send the bid set and the due date, and the quantities come back in 3 business days from complete documents; rush is quoted per job.

Send one bid set and compare