Illustration: a finished lobby in afternoon light, with oak shelving, a lounge, a dining area and tall glass doors.

Manufacturer RFQs for wood doors, door hardware and flooring

Maverick Takeoff Solutions builds wood door RFQ lines from its Division 8 takeoff, quoted per project: every wood opening from the door schedule, identical builds consolidated and preps written from the hardware sets, so each supplier prices the same count. It also builds hardware counts and a $125 flooring vendor RFQ workbook with waste and sundries. Vendors supply the prices.

Send an RFQ package

  • 100 percent US based estimators
  • Jesse Byrd reviews every set before delivery
  • Corrections to our work are free; client revisions and new addenda are billable

A wood door RFQ lists every wood opening from the door schedule, identical builds consolidated, with thickness, size, elevation, fire rating and hardware preps, so the supplier prices your count. Maverick Takeoff Solutions builds them from its Division 8 takeoff, plus door hardware counts and flooring vendor RFQ tabs with waste and sundries.

Best for. Flooring and Division 8 subcontractors who price material from more than one vendor on every bid and want each vendor quoting the same counts, the same waste and the same sundries. If your flooring dealer or door distributor already builds the RFQ from your quantities and you trust the counts, you may not need ours. If you only ever buy from one supplier, a phone call may be enough.

Manufacturer RFQs are part of our construction procurement support for subcontractors, next to submittal support and vendor quote comparison.

Why vendor quotes come back impossible to compare

Send the same bid set to three suppliers and ask each to quote it, and you get three takeoffs. One carries 10 percent waste on the carpet tile, one carries 5, one leaves waste to you. One quotes adhesive, one forgets it. On doors, one supplier reads a pair where the plan shows a single, another quotes a 20 minute label the schedule never asked for. The totals differ, and you cannot tell how much of the difference is price and how much is quantity.

An RFQ built from one takeoff fixes the quantity side. Every vendor gets the same lines, the same order quantities with waste already applied, and the same sundries. What comes back differs only where it should: unit price, freight, lead time and exclusions.

What goes on every RFQ line

This is what a typical line of our RFQs carries, for flooring and for wood doors. Use it as a check on any RFQ, ours or one built in your office.

What goes on every RFQ line
What the line carries Flooring vendor RFQ workbook Wood door RFQ lines Why it matters to the quote
Product identity Tag from the finish schedule, then manufacturer, collection, style, color and size or profile Door thickness, size, elevation and fire rating Two vendors quoting different products is the most common reason quotes do not compare
Quantity Order quantity with waste already applied, stated per line Identical builds consolidated and their counts summed The vendor prices your count instead of making their own
Unit SF, SY, LF, EA, gallons, bags, pails or rolls, as the product is sold Each, with pairs written as a pair size; communicating pairs marked separately A price per SY against a price per SF looks like a bargain that is not
Accessories Sundries calculated from coverage rates: adhesive, primer, grout, thinset, seam sealer Preps written from the hardware sets Sundries and preps are where quotes most often leave things out
Grouping One tab per manufacturer; when the manufacturer is not specified yet, one tab per category, flagged Consolidated on preps, not on hardware set number Each vendor gets only its own lines, and identical doors are priced once
Unknowns A quantity that cannot be fixed yet is marked TBD, never left blank No TBD line goes out; preps inferred from function flags are stated as inferred A blank reads as zero to the vendor
Price Left for the vendor to fill Left to the supplier's reply You see their number, not ours
Notes Building, floor, room and detail references for the line The door marks behind each consolidated line stay in the workbook You can trace any quoted line back to the plans

Wood door RFQs

A wood door RFQ starts from the finished door and frame schedule in our Division 8 takeoff, never from a recount. We filter the schedule to wood openings, build one line per schedule row, then consolidate identical builds and sum the quantities. The output is a two tab workbook plus the consolidated lines as plain text, ready to paste into the email to your door supplier.

Three checks run on every wood door RFQ before it leaves us:

  1. No TBD line survives. TBD on a door line means the hardware preps were never obtained. We get them from the hardware sets, or write them from the function flags and say so on the line.
  2. Pairs are written the way the supplier reads them. An ordinary pair carries the pair size and nothing else. Communicating pairs are marked separately, because they are two doors in one opening.
  3. Consolidation happens on preps, not on set number. If the consolidated count equals the raw line count, the preps are probably still placeholders, and the RFQ goes back for another pass.

Pairs on the schedule are checked against the plans during the takeoff, so a pair drawn as a single is caught before it reaches a supplier. If the architect lists only hardware group numbers, the missing supplier hardware schedule is the first RFI, and any prep written from function flags is marked as inferred.

Door hardware and frame RFQs

Our Division 8 takeoff rolls the hardware sets up to the component: each component per set times the openings it serves, then a project total of hinge pairs, closers, locksets, exit devices and the rest. The door and frame schedule carries frame type, material and throat for every opening. Those are the counts a door hardware RFQ and a hollow metal frame RFQ are built on. On Division 8 work we can turn the same rollup into manufacturer RFQs for hardware and frames, send them and compare the quotes, quoted per project.

If you run Comsense, the same schedule also feeds the Comsense ready door schedule entry, so the RFQ, the import and the takeoff carry the same openings.

Flooring RFQ workbook

For flooring, the vendor RFQ workbook is built from our commercial flooring takeoff, with one tab per manufacturer, or one tab per category when the manufacturer is not specified yet. Each tab carries the order quantities with waste applied.

Sundries are calculated from coverage rates, not guessed: adhesive, primer, grout, thinset and seam sealer each land on the tab of the manufacturer that supplies them. Manufacturers the finish schedule does not confirm are flagged, and an unspecified product is grouped by category until the manufacturer is known.

The open items checklist comes free with it: every TBD, blank and assumption in the workbook in one list, each with the next action.

Ways a wood door RFQ gets built

A wood door and door hardware RFQ can come from several places. Here is how each handles pairs, preps and consolidation, including where we are not the right call. Maverick Takeoff Solutions sells the last option in this table. For flooring and general material pricing options, see the comparison on our procurement support page.

Ways a wood door RFQ gets built
Option Who counts the openings Pairs Preps Consolidation Best for
The door distributor builds it from the plans The distributor Read from the plans by the distributor From the distributor's reading of the hardware sets The distributor's own grouping One distributor you already trust, on a small job
The hardware supplier or consultant schedule The supplier or the AHC As the hardware schedule lists them From the hardware schedule By hardware set Jobs where the hardware schedule is final before bid
A report out of your door estimating software Your office, in the software As entered in the software As entered in the software In the software's layout; splitting by vendor and writing preps is still someone's job Teams that run their own door software and add the rest by hand
Your estimator builds it by hand Your office Whatever your template holds Written by hand from the sets Done by hand when time allows Offices with an estimator who has open hours
Maverick Takeoff Solutions RFQ lines Our US based team, from our Division 8 takeoff Checked against the plans; communicating pairs marked From the hardware sets, or from function flags and marked inferred On preps, not on set number Subs who quote doors from more than one supplier
Illustration: a large linen drum pendant over a lobby lounge, with oak shelving and a dining area beyond.

Price and turnaround

For flooring, the vendor RFQ workbook is a flat $125 per job add on, ordered with the takeoff or after it is delivered. The open items checklist is free with it. Flooring takeoffs themselves are $0.0125 per SF with a $125 project minimum, and identical repeated layouts are counted once; see pricing.

For doors, frames and hardware, the wood door RFQ lines are quoted with the takeoff. Every Division 8 job is quoted per project, and the quote names the drivers: opening count, hardware sets, unit types and floors, and the import and RFQ lines you want.

When the quotes come back, quote leveling lines up to 4 supplier quotes side by side against our quantities for $100 per package, plus $25 for each extra quote. It shows unit and extended prices, freight, lead time, exclusions and lines a vendor left out. You pick the vendor.

Our standard takeoff turnaround is 3 business days from complete documents; rush is quoted per job.

Corrections to our work are free. Client driven revisions, such as a changed finish schedule or a new hardware schedule from the supplier, and new addenda are billable and quoted before work starts.

What this service is not

It is not pricing. Our RFQs are quantity only: your vendors supply the prices, and we never set your margin. It is not a purchase order, and it does not pick the vendor. It is not a hardware submittal; on jobs that call for an Architectural Hardware Consultant, the AHC keeps the hardware schedule and the submittal. It is not a product data package either; that is submittal support.

By default the RFQ comes to you and goes to your vendors under your company name. On Division 8 work we can also send the RFQs to manufacturers and compare the quotes for you, quoted per project.

Part of the same department as your takeoff

Maverick Takeoff Solutions is an outsourced preconstruction and estimating department for commercial subcontractors. Flooring first; also painting, drywall, fencing, and doors, frames and hardware. Our RFQs cover flooring and Division 8. The RFQ sits right after the takeoff in the same job: the same estimator's quantities go to your vendors, then into quote comparison and, after award, into submittal support. Our estimators are 100 percent US based, and Jesse Byrd, our founder, reviews every set before delivery. For how a job moves from intake to delivery, see how we work.

Bidding a job you will buy material for? Send the bid set and tell us which vendors you quote from. Send an RFQ Package Request

What you receive

  • Vendor RFQ workbook, one tab per manufacturer (flooring)
  • Wood door RFQ workbook and consolidated door lines for the supplier email
  • Open items checklist

How it is priced

Quoted per project, with the price drivers named.

What sets the price

  • Number of manufacturers and vendors
  • Number of products or door builds
  • Hardware sets that need preps written
  • Whether we also line up the quotes that come back

See pricing for every trade

Questions and answers

What is in a wood door RFQ?

A Maverick Takeoff Solutions wood door RFQ lists every wood opening from the finished door schedule, one line per row, then consolidates identical builds and sums them. Each line carries thickness, size, elevation, fire rating and the preps from the hardware sets. You get a two tab workbook plus the consolidated lines as text to paste into your supplier email.

Do you price the material on the RFQ?

No. Maverick Takeoff Solutions RFQs are quantity only. The price is left for each vendor to fill, so you see the vendor's number and not ours. We never set your margin. Once the quotes come back, quote leveling lines them up against our quantities so you can compare them.

Do I need a Maverick takeoff to order an RFQ?

Yes. Every Maverick Takeoff Solutions RFQ is built from our own takeoff, so the quantities your vendors price match the takeoff line for line. On doors the RFQ comes from the finished door and frame schedule, never a recount. Order the RFQ with the takeoff or after it is delivered.

Who sends a wood door RFQ to the door supplier?

Usually you do. Maverick Takeoff Solutions delivers the consolidated wood door lines as plain text, ready to paste into your own email to the door supplier, plus the workbook behind them, so the request goes out under your company name. On Division 8 work we can also send the RFQs to manufacturers and compare the quotes, quoted per project.

What does a wood door RFQ cost?

At Maverick Takeoff Solutions, wood door RFQ lines are quoted with the Division 8 takeoff, and the quote names the drivers: opening count, hardware sets, unit types and floors, and the RFQ lines you want. Every Division 8 job is quoted per project. On flooring jobs, the vendor RFQ workbook is a flat $125 per job.

When should someone else build my manufacturer RFQ?

When your dealer or door distributor already builds the RFQ from your quantities and you trust the counts, keep that instead of paying Maverick Takeoff Solutions. When you buy everything from one supplier, a call may be enough. When your estimator has open hours after each takeoff, an in house RFQ stays close to the people who know your vendors.

Illustration: the lobby in warm evening light, with lamps glowing over the lounge and dining area.

Send the RFQ package

Send it with the due date, and we confirm scope, price and delivery date in writing before any work starts.

Send an RFQ package