
How Maverick Takeoff Solutions works, from bid set to delivery
Maverick Takeoff Solutions returns quantities in 3 business days from complete documents, with rush quoted per job: we lock the scope you carry, review the documents, run a measured takeoff and send it back with a scope page and open questions. Commercial flooring is $0.0125 per SF with a $125 project minimum; other trades are quoted per project.
Maverick Takeoff Solutions works as an outsourced preconstruction and estimating department, and this page shows each step between the bid set and your numbers. Our mistakes are corrected free; addenda and client revisions are quoted before work starts.
Best for. Commercial flooring, painting, drywall, fencing and door subcontractors who want quantities, a scope page and ranked questions from one accountable team, with field verification in Palm Beach County. If you need a survey grade as built, a BIM model, or the cheapest single takeoff with no scope review, someone else is the better pick, and the path table near the end of this page says who.
What happens between "here is the set" and "here are your numbers"
If you have been burned by a cheap takeoff, you already know the problem usually was not the measuring tool. It is the missing finish tag nobody asked about, the addendum that was never read, the base that was not carried, and the argument afterward about who pays to fix it. So here is exactly what we do with a bid set, what you receive at each step, and who pays when something changes.
We work as your outsourced estimating department, not a file in a queue. The takeoff is one step of nine.
The nine steps
1. Intake and scope lock
You send the set through the request form. Before anyone measures, we confirm which scopes you carry. On a flooring job that means softgoods, resilient, hard tile, poured or fluid applied floors, polished concrete, terrazzo, base and transitions; on a door job it means doors, frames, hardware or all three. Anything you do not carry is listed as By Others, never dropped, so you can see it was found and left out on purpose.
Your plans stay in a client portal or a restricted folder, and only the estimators assigned to your job can open them. We sign an NDA on request.
We also check the set is complete: plans, schedules, specs for your division, and every addendum issued to date. Missing documents are flagged to you before work starts, because a takeoff on an incomplete set is a revision waiting to happen.
You receive: written confirmation of scope, the documents we are working from, and the turnaround for this set: 3 business days from complete documents; rush quoted per job.
2. Document review
We read the set before anyone measures. Anything the documents cannot settle goes on the questions list, not into a guess.
You receive: nothing yet. This step is why the questions you get in step 6 are the right ones.
3. Bid qualification (optional)
If you order a bid review, we score the job on eight factors: distance, size and fit, owner and funding, design completeness, schedule and mobilizations, contract terms such as retainage and pay if paid, GC relationship, and scope clarity. Each factor is marked Favorable, Caution, Watch or Action Required. The Go or No Go call is made by a person, with the reason written down, not by a formula.
You receive: a one page Bid Snapshot.
4. Measured takeoff
A trade estimator measures every tag, room and opening. Our estimators are 100 percent US based. Flooring is taken off in MeasureSquare; see MeasureSquare takeoffs for flooring contractors. Door schedules are checked against the plans, because a pair drawn on the plan and listed as a single in the schedule changes the opening count, so we verify pair versus single on the plan rather than trusting the schedule alone.
Units are carried the way your vendors sell: SY for carpet, SF for resilient and tile, LF for base and transitions, each for corners, thresholds and openings. Gross, net and waste travel together, so you can see the waste we carried and change it. Anything that cannot be determined from the documents is marked TBD and goes on the questions list. We never fill an unknown with a plausible number.
You receive: the color coded plan set.
5. QA review
Jesse Byrd, our founder, reviews every set before delivery.
You receive: nothing extra. No set is delivered before this review.
6. Scope, qualifications and questions
Quantities alone do not protect you when the GC later says something was included. So every takeoff carries a qualifications and assumptions page: what was included, what was excluded, what was assumed and what could not be determined. Scope is sorted the way you will defend it:
| Group | What goes in it |
|---|---|
| Above the Line | Work clearly in your scope |
| Below the Line | Work that is adjacent, ambiguous or arguably someone else's |
| Exclusions | Work explicitly not included, including items marked BY G.C. or By Millworker, listed so it is visible that we saw them |
Open items are ranked: HIGH changes your number, MED changes how you present it, INFO is worth knowing. Questions are written so a PM can answer them quickly. More on this in scope analysis.
You receive: the scope page and the ranked questions list, ready to send to the GC as RFIs if you choose.
7. Delivery
Flooring takeoffs come back as color coded PDF plans, an Excel quantity report and the native MeasureSquare files. We do not promise RFMS files.
If you want the takeoff carried further, order flat fee add ons with it: an import workbook built to load into your estimating or ERP system ($75), a vendor RFQ workbook with sundries worked out from coverage rates ($125), or a branded scope of work PDF for the GC in your company's colors ($175). All three are $325, and an open items checklist comes free with any add on.
Delivery is through your client portal or a restricted folder that only you and the estimators on your job can open.
You receive: color coded PDF plans, the Excel quantity report, the native MeasureSquare files on flooring jobs, the scope page and the questions list, plus any add ons you ordered.
8. Addenda, revisions and corrections
When an addendum, ASI or bulletin lands, we compare it against the set we measured and report each change as ADDED, NO CHANGE or REVISED, by tag and by room. You see only what moved, and an addendum that does not touch your trade is reported as no change rather than silently ignored. More on this in addendum and revision analysis.
Who pays for that work depends on whose change it is. The table below is our policy.
You receive: an addendum delta report, and revised files for the changed areas.
9. Field verification (Palm Beach County)
Drawings are not the building. On renovation, tenant improvement and occupied space work in Palm Beach County, we measure the site in person before you bid or order: room by room quantities, base and perimeter, transitions, stairs, photos, and a plan versus field variance list. Where lidar assisted scanning is used, it is measurement for estimating and material ordering, not a boundary or construction survey. Field measures start from $200 per site visit.
Takeoffs from plans are nationwide. Only the site visit is local. Details are on field measures in Palm Beach County.
You receive: the field measure package, sent to you or straight to the estimator on your takeoff.
Who pays when something changes
A correction fixes our mistake on the documents you sent. We absorb it. A revision is new work caused by a change outside our control. We quote it before we start. We keep this line clear because the argument about who pays for a fix costs both of us more than the fix does.
| Situation | Correction or revision | Who pays |
|---|---|---|
| We missed the base in a corridor that is on the drawings you sent | Correction | We fix it and reissue the files at no charge |
| We used the wrong roll width or misread a finish tag | Correction | We fix it at no charge |
| Our totals do not match between the quantity report and the import file | Correction | We fix it at no charge |
| The architect issues an addendum that moves a tenant wall | Revision | Quoted before we start; you get a delta report |
| An ASI or bulletin swaps LVT for carpet tile in one wing | Revision | Quoted before we start |
| The GC reissues the full set as a conformed or revised set | Revision | Quoted before we start, based on the sheets that changed |
| You decide to carry a scope you excluded at intake, or add an alternate | Revision | Quoted before we start |
| You want material pricing added | Not included by default | Quoted separately, only if you ask |
| An RFI answer from the GC changes the scope | Revision | Quoted before we start |
If it is not obvious which one it is, we show you the sheet and say which before any charge.

Turnaround
Standard turnaround is 3 business days from complete documents: plans, schedules, specs for your division and every addendum issued so far. We confirm it in writing when we accept the set. Rush is quoted per job: if your bid date is sooner, tell us at intake, and the rush is quoted before work starts, never added after.
What we do not do
- Material pricing, unless you ask. Takeoffs are quantity only by default. Your pricing and margin stay with you.
- Legal advice. Contract review is a commercial risk review of payment terms, retainage, indemnity, insurance, liquidated damages and notice provisions. It is not legal advice; your attorney decides what to sign.
- Guess at unknowns. A TBD on the questions list is better than an invented dimension that ships to your GC.
- Replace estimators with software. We use AI assisted document analysis to find sheets and compare revisions faster. A person measures, checks and signs off. AI assists estimators; it does not replace them.
- Survey work. A field measure is for estimating and ordering material, not a land survey, a stamped as built or a BIM model.
- Field visits outside Palm Beach County. Estimating is nationwide; site visits are Palm Beach County only.

Ten questions to ask any takeoff vendor
Use these on anyone you are considering, including us. A vendor with a real process can answer every one in a sentence.
| Question to ask | Why it matters | Our answer |
|---|---|---|
| What starts the turnaround clock? | A quoted turnaround means nothing if the clock starts after a week of questions | Complete documents, confirmed in writing at intake; standard turnaround is 3 business days from there, rush quoted per job |
| Who checks the takeoff, and against what? | "QA" with no named person is a word, not a step | Jesse Byrd, our founder, reviews every set before delivery (step 5) |
| Does every quantity cite its sheet? | It is how you check a number in a minute instead of an hour | Yes |
| What happens to things I do not carry? | Dropped scope looks like an oversight when the GC asks | Listed as By Others or Exclusions, never dropped |
| What do you do with an unknown? | A guessed number is worse than an open question | TBD on the questions list |
| What is a correction and what is a revision? | This is where vendor relationships go wrong | The table above |
| What do you send when an addendum drops? | A full redo costs more and hides what changed | A delta report: added, no change, revised |
| Will it come back in the format I price from? | Retyping a takeoff into your system is where errors start | Color coded PDF plans, an Excel quantity report and native MeasureSquare files; your own import workbook as a $75 add on |
| Do you price material? | Your margin is your business | Quantities only unless you ask |
| Can anyone stand in the building? | Renovation drawings are often wrong | Yes, in Palm Beach County |
Which path through the process fits your job
Not every job needs all nine steps. These are the common paths, and one row for when you should use someone else.
| Path | Steps used | What you get | Best for |
|---|---|---|---|
| Bid review first | 1, 2, 3 | Bid Snapshot with a Go or No Go call | A crowded bid board where you need to decide what to chase before anyone measures |
| Takeoff from plans | 1, 2, 4 to 8 | Plans, quantities, scope page, questions, addendum deltas | New construction with current drawings, anywhere in the US |
| Takeoff plus field measure | 1, 2, 4 to 9 | All of the above plus measured quantities and a variance list | Renovation, TI and occupied space work in Palm Beach County |
| Monthly department | All steps, every bid | One intake, one format and one QA standard across every branch, through our outsourced estimating department | Shops that bid every week and are one estimator short |
| Someone other than us | Not applicable | A survey grade as built, a BIM model, or the lowest price on a single takeoff | Licensed surveyors and scanning firms for design documentation; a marketplace freelancer if you will check every number yourself; an offshore takeoff shop if price leads and it does not matter who opens the plans (US based vs offshore); your flooring dealer or mill's free takeoff if you buy from them and accept their count (outsourced vs dealer takeoffs); takeoff software if your estimator has open hours |
Commercial flooring takeoffs are $0.0125 per SF with a $125 project minimum, with identical repeated layouts (for example 50 identical units) counted once; every other trade is quoted per project; field measures start from $200 per site visit; add ons are flat fees per job. Details for each path are on the pricing page.
If you have a question first, the FAQ answers the common ones and the contact page reaches a person.
Who you will work with
Every estimator who opens your plans works in the United States. Jesse Byrd, our founder, runs the company, reviews every set before delivery and answers for all of it; read more about Maverick.
The last check before delivery belongs to one person, Jesse Byrd, the founder.
Questions and answers
How long does a takeoff take?
Standard turnaround at Maverick Takeoff Solutions is 3 business days from complete documents: plans, finish or door schedules, specs and every addendum issued so far. Rush is quoted per job. If your bid date is sooner, tell us at intake and we will say whether we can make it, and quote the rush, before any work starts.
Who checks the takeoff before I get it?
Jesse Byrd, Founder of Maverick Takeoff Solutions, reviews every set before delivery. The estimator who built the takeoff answers for it, and the qualifications and assumptions page shows what was counted and excluded so you can check it yourself. If anything in it turns out to be our mistake, the correction is free.
What is the difference between a correction and a revision?
A correction fixes a mistake Maverick Takeoff Solutions made on the documents you sent, and it costs you nothing. A revision is new work caused by a change outside our control: an addendum, ASI, bulletin, reissued set, or a change to the scope you are bidding. Revisions are quoted before we start.
What happens when an addendum is issued after you deliver?
Send it over. Maverick Takeoff Solutions compares it against the set we measured and reports each change as added, no change or revised, by tag and by room, so you see only what moved. That delta is a revision, quoted before we start. If the addendum shows a mistake in our own work, that correction is free.
Do your takeoffs include material pricing?
No, not by default. Maverick Takeoff Solutions delivers quantities, and your pricing and margin stay with you. If you want material pricing on a job, ask and we will quote it separately before work starts. The quantities come in SF, SY, LF and each counts, in the units your vendors sell in.
What do you need from me to start?
The full bid set (plans, finish or door schedules, the specs for your division and every addendum to date), the bid due date and which scopes you carry. To load the quantities into your own estimating or ERP system, send Maverick Takeoff Solutions a blank copy of your import file; that is the import workbook add on, $75 per job.
Is the contract review legal advice?
No. Contract review at Maverick Takeoff Solutions is a commercial risk review: we flag payment terms, retainage, indemnity, insurance, liquidated damages and notice provisions so you know what you are signing. It is not legal advice. Your attorney decides what the contract means and whether to sign it.
When should I use someone other than Maverick?
Use a licensed surveyor or scanning firm, not Maverick Takeoff Solutions, for a stamped survey, BIM model or survey grade as builts. A marketplace freelancer is cheaper for a takeoff you will check yourself. If your estimator has open hours, takeoff software may do. A dealer or mill's free takeoff may do if you buy from them and trust it.

Send the bid set
Send the bid set and the due date, and the quantities come back in 3 business days from complete documents; rush is quoted per job.
