Illustration: a lobby dining area with a round oak table, upholstered chairs and an olive tree in a stone planter.Illustration: a brushed steel lever handle on a walnut door sample.

Comsense door schedule entry for door and hardware distributors

Maverick Takeoff Solutions handles Comsense door schedule entry for door and hardware distributors, quoted per project with the takeoff: US based estimators build the door and frame schedule from your bid set and deliver a Comsense / DS import file plus the Excel template, validated against your code tables. Standard takeoff turnaround is 3 business days from complete documents.

Request a Division 8 takeoff

3 business days from complete documents; rush quoted per job

  • 100 percent US based estimators
  • Jesse Byrd reviews every set before delivery
  • Corrections to our work are free; client revisions and new addenda are billable

Maverick Takeoff Solutions handles Comsense door schedule entry for Division 8 distributors and installers: US based estimators build the door and frame schedule from your bid set and deliver it as a Comsense / DS import, a tab delimited file plus the Excel template, with every row validated against your code tables. It is quoted per project with the takeoff, and standard takeoff turnaround is 3 business days from complete documents.

Best for. Door and hardware distributors and Division 8 installers who run Comsense and lose estimator hours keying openings from drawing sheets. If your architect or hardware consultant has already issued the schedule as a spec writer file, Comsense can import that directly and you may not need us for entry. If you need a hardware specification written or a submittal sealed by an Architectural Hardware Consultant, use one.

Send a door schedule for Comsense entry

The import is one part of our division 8 estimating services, within our takeoff and estimating services. It is built from the same schedule as the rest of the takeoff, so the openings in Comsense match the openings in the workbook and on the RFI list.

What comes back with Comsense door schedule entry

Every import is generated from the finished door and frame schedule, never counted a second time. You receive:

File What is in it What you do with it
Comsense / DS import Tab delimited file, one line per opening line on the schedule, values checked against your code tables Load it into Comsense
Excel import template The same lines in your Excel import template Review or adjust lines before loading
Door and Frame Schedule Door mark, location, opening and leaf count, door type, size, door material, frame type, material and throat, fire rating, exterior, hardware set, scope and notes Check any import line against the drawings
Hardware set list and component rollup Openings per set and a project rollup of hinge pairs, closers, locksets, exit devices and the rest Price hardware in your own system
RFIs and Questions Every conflict found, ranked by priority, with the door mark and the sheet Send to the GC or architect before bid day

Quantity only unless you ask for pricing. Your estimators keep the pricing in Comsense or your own system.

Where each import value comes from

An import is only as good as the schedule behind it. These are the sources we take each value from, and the check each one gets before the file leaves us.

Import value Where we take it from Check before it ships
Opening (door mark) The architect's door mark on the door schedule, kept exactly Door marks on the schedule and the plans are compared; mismatches go on the RFI tab
Leaf count, single or pair The floor plan, not only the schedule Disagreements go on the RFI tab with the door mark and the sheet
Door type and size The door schedule and the door type sheet Missing door types go on the RFI tab
Jamb depth (frame throat) The partition type the frame sits in Throat matches the wall type, not a typical
Fire rating and exterior The door schedule Carried on every line so they can be filtered and counted
Hardware set The hardware sets or groups as the drawings define them Rated openings on unrated hardware groups are flagged
Quantity The schedule, with typical guestroom doors built from unit composition times unit count times floors Line count and total quantity tie to the schedule totals

Totals reconcile or the file does not ship. Openings, leaves and Division 8 leaves on the schedule match the hardware counts and the import line count, minus whatever was excluded as by others. Storefront, automatic entrances and gates by others stay visible on the schedule in grey and are left out of the import unless you tell us otherwise.

Illustration: the lobby marked up as a takeoff, with the floor, doors, glass and millwork each filled in its own color.

Ways to get a door schedule into Comsense

Each of these works for someone. The difference is who keys the openings, who checks the values against your code tables and who catches the conflicts between the schedule and the plans. For the wider comparison of who does the whole takeoff, see the division 8 estimating services page.

Ways to get a door schedule into Comsense
Option Who keys the openings Who checks values against your code tables Who resolves schedule versus plan conflicts Cost Best for
Your own estimator keys it Your staff Your staff Your staff Staff hours; full math on outsourced vs in house estimator Steady volume you can staff year round
Spec writer project import Comsense, from the spec writer file (1) Not stated on the page cited Not stated on the page cited Not stated on the page cited; ask Comsense Jobs where a hardware consultant or manufacturer has already issued the schedule as a file
Supplier's free estimate The supplier's estimator Ask the supplier The supplier Free, bundled with the supply quote; see outsourced takeoffs vs dealer takeoffs Projects where you have already chosen the supplier
Maverick import A US based Maverick estimator Maverick, row by row before delivery; a blank required field or an unrecognized code stops the file Maverick, with every conflict logged as an RFI Quoted per project with the takeoff Bid sets where the door schedule exists only as drawing sheets

On a Maverick import the line count is also reconciled to the schedule totals before delivery, as described above.

Source: (1) Comsense Enterprise features page, https://www.comsenseinc.com/comsense-enterprise/, read 2026.11.18. It lists importing projects from third party specification writers including Stanley, Assa Abloy and Allegion, and estimating by opening or in bulk.

Comsense describes itself as ERP software for the construction industry specializing in architectural openings, built for door, frame and hardware distribution (https://www.comsenseinc.com/, read 2026.11.18). Comsense is now part of Advantive (https://www.advantive.com/newsroom/advantive-acquisition-comsense/, read 2026.11.18). Comsense is software sold by its own vendor, and Maverick is not affiliated with Comsense or Advantive.

Running MeasureSquare for flooring instead? See MeasureSquare takeoffs.

How a Comsense import job runs

  1. You send the set and your code tables. Architectural drawings, door schedule sheets, door and frame type sheet, partition types, unit plans, the spec book if there is one, and the bid date. Tell us you want the Comsense import and whether you want wood door RFQ lines too.

  2. We confirm scope and timing before we start. If the hardware schedule or spec is missing, we tell you at intake. Standard takeoff turnaround is 3 business days from complete documents; rush is quoted per job.

  3. We build the schedule. Opening by opening, verified against the plans and the unit matrix.

  4. We generate and validate the import. The import file and template come from the finished schedule, and every row is checked against your code tables.

  5. QA before delivery. Jesse Byrd, Founder, reviews every set before delivery. Openings, leaves, hardware counts and the import line count have to reconcile.

  6. Addenda. When an addendum changes the schedule, we rerun the affected openings and show you what changed. Client driven revisions and addenda are billed as new scope. Corrections to our own work are free. For full change tracking across a set, see addendum and revision analysis.

How a takeoff moves through our QA

Illustration: a sunlit lobby looking toward a dining area, with tall glass doors and an olive tree in a stone planter.

What it costs

Doors, frames and hardware takeoffs are quoted per project. The Comsense import and the wood door RFQ lines are quoted with the takeoff. The quote names the drivers: opening count, hardware sets or groups, typical unit types and floors, and which import and RFQ files you want. See pricing for every trade and the flat fee add ons.

From the schedule to the RFQ

Once the openings are in Comsense, the next step is pricing from manufacturers. We can turn the same schedule into manufacturer RFQs for doors and hardware, with the wood openings pulled from the same schedule, identical builds consolidated and preps written from the hardware sets.

If door schedule entry is a weekly bottleneck rather than an occasional one, an outsourced estimating department may fit better than project by project orders.

Send a door schedule for Comsense entry

What you receive

  • Comsense / DS import file (tab delimited)
  • Excel import template
  • Door and Frame Schedule the import is built from
  • Hardware set list and component rollup
  • RFIs and Questions

How it is priced

Quoted per project, with the price drivers named.

What sets the price

  • Opening count
  • Hardware sets or groups
  • Typical unit types and floors
  • Whether you also want wood door RFQ lines

See pricing for every trade

Questions and answers

How does a line in the Comsense import trace back to the drawings?

Each line carries the architect's door mark exactly as it appears on the door schedule. Maverick Takeoff Solutions generates the import from the finished door and frame schedule, never counted twice, so the mark leads you to the door type, size, frame, fire rating and hardware set. Schedule versus plan conflicts are on the RFI list with the sheet.

Do you need our Comsense code tables?

Yes. Maverick Takeoff Solutions validates every row of the Comsense import against your code tables before delivery, so door types, frame types, materials and hardware sets load with the codes your system expects. Send them with the first set. A blank required field or an unrecognized code is an error, and the file does not ship with it.

How much does a Comsense import cost?

At Maverick Takeoff Solutions, doors, frames and hardware takeoffs are quoted per project, and the Comsense door schedule entry and wood door RFQ lines are quoted with the takeoff. The quote names what drives the price: opening count, hardware sets or groups, typical unit types and floors on hotels and multifamily, and which files you want.

How long does a Division 8 takeoff take when we want a Comsense import?

Standard turnaround at Maverick Takeoff Solutions is 3 business days from complete documents; rush is quoted per job. Jesse Byrd, Founder, reviews every set before delivery, and corrections to our own work are free. If the hardware schedule or spec is missing from the set, we tell you at intake, not on delivery day.

What happens when an addendum changes the door schedule after the import?

Maverick Takeoff Solutions reruns the affected openings, shows you what changed, and rebuilds the import from the revised schedule, so the file you load matches the current set. Client driven revisions and new addenda are billed as new scope and quoted before work starts. Corrections to our own work are free.

Is Maverick affiliated with Comsense?

No. Comsense is software sold by its own vendor, and Maverick is not affiliated with Comsense or Advantive. We are an outsourced preconstruction and estimating department for commercial subcontractors. We build the door and frame schedule from your bid set and deliver it as an import file that your own team loads into Comsense.

When should we not use Maverick for Comsense entry?

When the hardware schedule already exists as a spec writer project file, Comsense can import it directly, so keying help from Maverick Takeoff Solutions may not be needed. When you need a hardware specification written or a submittal sealed by an Architectural Hardware Consultant, use one. When your supplier is already chosen, its estimate may be enough.

Illustration: the lobby in warm evening light, with lamps glowing over the lounge and dining area.

Send the bid set

Send the bid set and the due date, and the quantities come back in 3 business days from complete documents; rush is quoted per job.

Request a Division 8 takeoff