Maverick Takeoff Solutions provides construction procurement support for commercial subcontractors: manufacturer RFQs and vendor quote leveling built from the same takeoff quantities, plus product documentation. On flooring, the vendor RFQ workbook is $125 per job and quote leveling is $100 for up to 4 quotes; other work is quoted per project. You send the RFQs and pick the vendor.
- 100 percent US based estimators
- Jesse Byrd reviews every set before delivery
- Corrections to our work are free; client revisions and new addenda are billable
Construction procurement support for a subcontractor is the buying work after the takeoff: manufacturer RFQs, vendor quote comparison and product documentation. Maverick Takeoff Solutions builds RFQs and levels vendor quotes from its own takeoff quantities. On flooring, the vendor RFQ workbook is $125 per job and quote leveling is $100 for up to 4 quotes.
Best for. Commercial flooring and Division 8 subcontractors who price material from several vendors on every bid and lose estimator hours to building RFQs and lining up quotes that do not match. If one dealer supplies most of your work and builds the quote from your quantities, or your purchasing coordinator has the hours, keep it in house.
The buying side of a bid
The takeoff tells you how much. It does not tell you what the material costs. On most finish and Division 8 bids, the next step is the same: split the quantities by manufacturer, add waste and sundries, send them to vendors, wait, and then compare quotes that never cover the same scope. One vendor leaves out freight. Another quotes a different adhesive. A third prices half the hardware sets and writes "subject to final schedule" on the rest.
Procurement and Documentation Support is the part of Maverick that does that work. It is one of our five service buckets, it sits right after takeoff and estimating, and it starts from the same quantities, so the RFQ, the leveled quotes and the takeoff all match line for line.
What our construction procurement support covers
| Service | What you send | What comes back | Price |
|---|---|---|---|
| Vendor RFQ workbook (flooring) | Nothing extra; it is built from our flooring takeoff | One tab per manufacturer (or per category when the product is not yet specified), quantities with waste, sundries calculated from coverage rates, unconfirmed manufacturers flagged | $125 per job |
| Wood door RFQ lines | The Division 8 set, with the takeoff | Wood openings filtered from the schedule, identical builds consolidated, preps written from the hardware sets, ready to paste into your supplier email | Quoted with the takeoff |
| Quote leveling (flooring) | Up to 4 vendor quotes for the same scope | Each quote side by side against our quantities, face total and leveled total, and the questions to close before the PO | $100 per package up to 4 quotes; $25 each extra quote |
| Division 8 RFQs and quote comparison | The Division 8 set, with the takeoff | Manufacturer RFQs from the door schedule, with the quotes collected and laid side by side | Quoted with the takeoff |
| Trade bid set extract (flooring) | The bid set | Only the sheets and spec pages your trade needs, bookmarked, in one PDF for vendors, installers or a super | $75 per job |
| Submittal support (developing) | Finish schedule and spec sections | Product data submittal packages you submit through your GC | Quoted per project |
Manufacturer RFQs
The RFQ is where a missed sundry or a wrong manufacturer becomes a wrong number. We build it from the takeoff, not from a retyped list.
On flooring, the vendor RFQ workbook gives each manufacturer its own tab, carries quantities with waste, and calculates sundries from coverage rates: adhesive, primer, grout, thinset and seam sealer. Where the finish schedule names no manufacturer, the product goes on a category tab and is flagged so it gets confirmed before anyone orders.
On Division 8, the wood door RFQ lines come from the same door schedule we built: wood openings filtered out, identical builds consolidated and summed, and preps written from the hardware sets. We can turn the same schedule into manufacturer RFQs for doors, frames and hardware, collect the quotes and lay them side by side for your estimator. Division 8 RFQs and quote comparison are quoted with the takeoff.
More on manufacturer RFQs for Division 8 and flooring, and on the takeoff they come from: doors, frames and hardware takeoffs and commercial flooring takeoffs.
Vendor quote comparison
Three quotes for the same job rarely price the same scope. The lowest face total is often the one that left something out. On flooring, quote leveling puts up to 4 vendor quotes side by side against our quantities, then shows a leveled total next to the face total. It shows the differences; the choice of vendor is yours.
A few of the checks each quote runs against:
| What we check | What it catches | Why it changes your number |
|---|---|---|
| Quantity against the takeoff | A vendor that quoted fewer SY, SF or openings than the takeoff carries | A low total that only covers part of the job |
| Lines left out | A product, sundry or hardware set missing from the quote | Material you still have to buy after award |
| Exclusions and "subject to" | Wording that pulls items out of the price or makes it conditional | A firm looking number that is not firm |
| Freight | Freight excluded, estimated or billed separately | A cost that lands on the PO, not on the quote |
We also check lead time, validity, sales tax, minimums and the arithmetic on unit and extended prices. Every gap goes on a list of questions to close with the vendor before the PO. Quote leveling is listed with its price on the add on menu.
Submittal support and product documentation
After award, the same finish schedule turns into product data. Submittal support is newer than the rest of our work and is sold alongside this bucket. We prepare product data submittal packages for flooring and finish subcontractors. It is product data only, not shop drawings, you submit it through your GC, and it is quoted per project.
For product documentation that goes to vendors and installers before award, the trade bid set extract pulls only the sheets and spec pages your trade needs into one bookmarked PDF, with a cover listing every page and its source. The full contract set still governs.
Ways to get material priced
Disclosure: Maverick wrote this table and sells the last option in it. The other options are real, and for some shops they are the better choice.
| Option | Who does the work | What comes back | Where it falls short | Best for |
|---|---|---|---|---|
| Your estimator or purchasing coordinator | Your staff | RFQs and comparisons from someone who knows your vendors, terms and history | Takes hours from someone who is also estimating or buying for jobs in progress | Shops with a coordinator who has the hours |
| Your dealer or the manufacturer's rep | The supplier, for the products it sells | A quote, sometimes with a free takeoff, for that supplier's lines | One supplier's view; no comparison against other vendors; ask who owns a missed quantity | Jobs where one supplier covers most of the scope and you already chose it |
| Purchasing or procurement software | You, inside the software | RFQ routing, quote tracking and purchase orders | Tracks the request; someone still has to build the quantities and read the quotes | Teams that already have the quantities and need a record across many jobs |
| Maverick Procurement and Documentation Support | Our US based team, from our takeoff | Flooring RFQ workbook per manufacturer and leveled quotes with a question list; Division 8 RFQ lines and quote comparison | Built from a Maverick takeoff | Flooring and Division 8 subs who price from several vendors on every bid and lack the hours to build and compare RFQs |
If your dealer gives you a free takeoff with the quote, read outsourced takeoffs versus dealer takeoffs.

How a procurement job moves
- Send the bid set, or order with the takeoff. Tell us the trade, the manufacturers or vendors you buy from, and your bid date. Add the RFQ workbook or quote leveling when you order the takeoff, or after it is delivered.
- Scope lock. We confirm what you want built and the delivery date in writing before we start.
- The RFQ. Built from the takeoff: one tab per manufacturer, waste and sundries carried, unconfirmed products flagged.
- It goes out from you. The RFQ goes to your vendors from your company.
- Quotes back. On flooring, send us up to 4 quotes for the same scope; on Division 8, quote collection and comparison are set at intake. We level them against our quantities and list the questions to close before the PO.
- Review before delivery. Jesse Byrd, our founder, reviews every set before delivery.
Our standard takeoff turnaround is 3 business days from complete documents; rush is quoted per job.
Price
On flooring takeoffs, the vendor RFQ workbook is a flat $125 per job, quote leveling is $100 per package for up to 4 quotes plus $25 for each extra quote, and the trade bid set extract is $75 per job. Wood door RFQ lines and Division 8 RFQs and quote comparison are quoted with the takeoff. Submittal packages are quoted per project. All add on prices are on the add on menu; takeoff prices are on pricing.
If you also want a flooring takeoff ready to load into your estimating system, the ERP or estimating import workbook is a flat $75 per job add on.
Corrections to our work are free. Client driven revisions and new addenda are billable and quoted before work starts, such as a changed finish schedule or a substitution.
What this is not
Three things stay with you: you send the RFQ from your company, so the vendor relationship is yours; you pick the vendor; and you set the price and the margin. Our takeoffs are quantity only unless you ask for pricing, and in procurement support the material prices come from your vendors' quotes, not from us. It is not purchasing: we do not issue POs, and by default nothing goes to a vendor in your name. Submittal support is product data only, not shop drawings, and the architect decides approval.
Pricing material on a live bid? Send the bid set and tell us which vendors you buy from. Send an RFQ Package
What you receive
- Vendor RFQ workbook on flooring: one tab per manufacturer, quantities with waste, sundries from coverage rates, unconfirmed manufacturers flagged
- Quote leveling: face total and leveled total, freight, lead time, validity, sales tax, minimums, exclusions and missing lines
- Wood door RFQ lines from the Division 8 schedule
- Trade bid set extract for vendors and installers
- Product data submittal packages (developing)
How it is priced
Quoted per project, with the price drivers named.
What sets the price
- Number of manufacturers and vendors
- Number of quotes to compare
- Number of products and openings on the schedule
- Your due date
Questions and answers
What is construction procurement support for a subcontractor?
It is the buying work that follows the takeoff: building manufacturer RFQs, comparing the vendor quotes that come back and pulling the product documents together. Maverick Takeoff Solutions builds the RFQs and leveled quotes from its own takeoff quantities, so they match the takeoff line for line. Product documentation starts from your finish schedule and spec sections.
Do you send the RFQs to our vendors?
By default, no. The Maverick Takeoff Solutions vendor RFQ workbook comes to you and goes to your vendors from you, so the supplier relationship stays yours. On flooring, send us up to 4 quotes for one scope and we level them against our quantities. On Division 8 we can collect and compare quotes, quoted with the takeoff.
Do you price material or choose the vendor for us?
By default, no. Maverick Takeoff Solutions takeoffs are quantity only unless you ask for pricing, and in procurement support the material prices come from your vendors' quotes and your own rates. We never set your margin. Quote leveling shows where the quotes differ, including freight, lead time, tax, minimums and missing lines. Which vendor gets the order is your call.
Do we need a Maverick takeoff to use procurement support?
For the RFQ workbook and quote leveling, yes. Both are built from the Maverick Takeoff Solutions takeoff, so the quantities in the RFQ and the comparison match it. Order them with the takeoff or after it is delivered. Submittal support starts from your finish schedule and spec sections and is quoted per project.
What does procurement support cost?
On flooring takeoffs, Maverick Takeoff Solutions charges $125 per job for the vendor RFQ workbook, $100 per package for quote leveling up to 4 quotes plus $25 per extra quote, and $75 per job for a trade bid set extract. Division 8 RFQs and quote comparison are quoted with the takeoff. Submittal packages are quoted per project.
Which trades does procurement support cover?
Maverick Takeoff Solutions procurement support covers mostly commercial flooring and Division 8. On flooring, the RFQ workbook splits quantities by manufacturer and calculates adhesive, primer, grout, thinset and seam sealer from coverage rates. On doors, frames and hardware, the RFQ lines come from the door schedule we built. For other trades, ask first; we quote per project.
Is submittal support an established service?
No. Submittal support from Maverick Takeoff Solutions is newer than the rest of our work and is sold alongside procurement and documentation support: product data submittal packages for flooring and finish subcontractors, quoted per project. They cover product data only, not shop drawings, and you submit them through your GC.
When should we keep RFQs and quote comparison in house?
When your estimator or purchasing coordinator has the hours after each takeoff, or one dealer supplies most of your work and already quotes from your quantities. They know your vendors and terms better than Maverick Takeoff Solutions does. We are most useful when you price from several vendors on every bid and nobody has time to compare them.