Illustration: a lounge seating group on a jute rug over a polished stone floor, with dappled sunlight.

Addendum comparison service: what changed for your trade

Maverick Takeoff Solutions runs an addendum comparison service on takeoffs it delivered: each addendum, ASI or bulletin is marked ADDED, REVISED or NO CHANGE for your trade, with sheet and spec references, for $50 per addendum on flooring takeoffs. Updated quantities and other trades are quoted before we start, with delivery confirmed in writing.

Send the addendum

  • 100 percent US based estimators
  • Jesse Byrd reviews every set before delivery
  • Corrections to our work are free; client revisions and new addenda are billable

An addendum comparison service tells a subcontractor what an addendum, ASI or bulletin changed for their trade. On a takeoff Maverick Takeoff Solutions delivered, we mark each addendum ADDED, REVISED or NO CHANGE for your trade, with sheet and spec references. On flooring takeoffs that is $50 per addendum; updated quantities are quoted before we start.

Best for. Commercial flooring subcontractors who already have a Maverick takeoff, get addendum 3 two days before the bid, and need to know what moved for their trade, not just that something moved. If an addendum is two clouded sheets and your estimator has the hours, reading it in house is faster than sending it out.

Send the addendum

Addendum comparison service: the short version

  • What you get. An addendum change summary for your trade: each addendum marked ADDED, REVISED or NO CHANGE, with the sheet and spec references it came from. An addendum that does not touch your trade is reported as no change, not silently skipped.
  • Two levels. On a flooring takeoff, the change summary is a flat $50 per addendum on our add on menu. Updating the quantities and files for those changes is a revised takeoff, which is revision work quoted before we start.
  • Who needs it. Both levels are built on a takeoff Maverick delivered.
  • Who pays. Corrections to Maverick's work are free. Client driven revisions and new addenda are billable and quoted before work starts.
  • Who does it. Our US based estimators. Jesse reviews every set before delivery.

Addendum and revision analysis is one of the Preconstruction Intelligence services Maverick runs for subcontractors, next to bid review, spec review and scope analysis.

What each status means

An addendum package is rarely just your sheets. It is a narrative, a stack of reissued drawings, revised spec sections, RFI answers issued as addenda, and sometimes a new finish schedule. The question you need answered is narrow: did my number change, and where?

Status What it means What you do next
ADDED Scope that was not in the set you priced: a new room, a new finish tag, a new spec section, an alternate, a new opening Price it, or exclude it in writing
REVISED Scope that was there and changed: a tag swapped, a wall moved, a product substituted, a quantity that grew or shrank Update the line, and check the spec section for new requirements
NO CHANGE The addendum was read and does not touch your trade, or the sheets were reissued without a change for you Note it on your bid form so the GC sees you acknowledged it

Each status carries the sheet or spec section it came from, so your PM can open the drawing and check it in a minute. When you order a revised takeoff, you also get how much each quantity moved on the takeoff we delivered.

Change summary or revised takeoff: which one you need

Addendum change summary Revised takeoff
What it answers What changed for my trade, and where? What are my new quantities?
What you receive Each addendum marked ADDED, REVISED or NO CHANGE for your trade only, with sheet and spec references, and a plain line when an addendum does not touch your trade Updated quantities and revised files for the changed areas, with how much each quantity moved
Quantities updated No Yes
Price $50 per addendum, flat, on flooring takeoffs; other trades quoted before we start Quoted before we start, based on the sheets that changed
Needs a Maverick takeoff Yes, ordered with or after the takeoff Yes, it updates the takeoff we delivered
Best for Deciding whether the addendum matters before you spend estimator time on it Rebidding with the new numbers

The change summary is not a revised takeoff. When an addendum changes quantities, updating the takeoff is revision work, and we quote it before we start.

Who pays when an addendum shows something

Corrections to Maverick's work are free. Client driven revisions and new addenda are billable and quoted before work starts.

Reading an addendum sometimes turns up two different things. Say addendum 2 reissues sheet A601, the finish plan. If the new A601 adds a room that was not on the set you sent us, that is an addendum change: new work, quoted before we start. If the old A601 already showed a base run we left out, and the addendum only made it easier to see, that is our miss: we correct the takeoff and reissue the files at no charge. If it is not obvious which one it is, we show you both sheets and say which before any charge. The general rule, with more examples, is on how we work.

One addendum, five ways to handle it

Addendum 3 lands two days before the bid. Here is how the same addendum gets handled depending on who handles it. There is no single right answer; the right one depends on the size of the addendum and who has hours that week.

Option What happens Cost to you Strengths Limits Best for
Your estimator reads only the clouded sheets and the narrative A fast pass over what the architect flagged An hour or two of estimator time Fast, and your estimator already knows the job Changes outside the clouds, in the spec sections or in RFI answers issued as addenda, are easy to miss under deadline Small addenda on jobs your estimator took off and remembers well
Your estimator retakes the whole set The takeoff is redone against the conformed set Most of the original takeoff time again Nothing is assumed; every quantity is fresh Costs nearly as much as the first takeoff and hides what changed, so the GC question "what moved?" is still open A full reissue that changes most of your scope
The provider who did the original takeoff reruns it You send the addendum back to the takeoff vendor Varies; ask for the revision policy in writing before the first job The same person who measured the job reads the change You may get a new takeoff with no list of what changed; ask which you will get, and who pays for a missed item Shops with a takeoff vendor whose revision policy is written down
A dealer or mill takeoff is rerun The supplier who took off the job for material reruns it Varies; ask in writing what it costs and what it covers No separate takeoff invoice where the supplier does not charge for it Ask whether it covers scope outside their material and whether it lists what changed Jobs where you have already chosen the supplier
Maverick change summary or revised takeoff On a takeoff we delivered, we mark each addendum ADDED, REVISED or NO CHANGE for your trade; a revised takeoff also updates the quantities $50 per addendum for the change summary on flooring takeoffs; revised takeoffs and other trades quoted before we start Shows only what moved, with sheet and spec references; addenda that do not touch your trade are listed, not skipped; the same team can update the takeoff Needs a Maverick takeoff. Not worth it for a two sheet addendum your estimator can read in twenty minutes Subcontractors with several addenda in bid week and more ITBs than estimator hours

The comparison against hiring is on outsourced vs in house estimator, and the dealer route on outsourced takeoffs vs dealer takeoffs.

How addendum analysis works

  1. Send the addendum. Upload the addendum, ASI, bulletin or revised sheets through the request form, with the addendum number and the job name of the takeoff we delivered. Tell us your bid date.
  2. We confirm in writing. Scope, price and delivery date, before any work starts. A flooring change summary is the flat add on price; a revised takeoff is quoted from the sheets that changed.
  3. We compare. An estimator reads the narrative, the reissued and clouded sheets, the revised spec sections and any RFI answers issued in the addendum, and checks each against the set you priced. We use AI assisted document analysis to find sheets and compare revisions faster. A person measures, checks and signs off.
  4. Jesse reviews it. Every set is reviewed before delivery, change summaries included.
  5. You receive it. The change summary, plus the revised files for the changed areas if you ordered a revised takeoff. Your plans stay in a client portal or a restricted folder that only the estimators assigned to your job can open, and we sign an NDA on request.

What to send

  • The addendum, ASI or bulletin, including the narrative or cover letter.
  • Every reissued or clouded sheet and every revised spec section.
  • RFI answers the GC issued as part of the addendum.
  • The addendum number and the job name of the takeoff we delivered.
  • Your bid date, and whether you want the change summary only or a revised takeoff.

If an earlier addendum was never sent to us, tell us. A comparison against an incomplete set is a revision waiting to happen, so we flag missing documents before we start, not after.

Illustration: a sunlit lobby looking toward a dining area, with tall glass doors and an olive tree in a stone planter.

Trades we compare

The flat $50 change summary is confirmed for flooring takeoffs. On the other trades we take off, addendum work is revision work, quoted before we start, and it covers the same scope we took off:

All five trades are listed on Takeoff and Estimating.

What it costs

On a Maverick flooring takeoff, the addendum change summary is $50 per addendum, ordered with or after the takeoff. A revised takeoff, and addendum work on the other trades, is quoted before we start, based on the sheets that changed. Rush is quoted per job.

See pricing for how takeoffs are priced, and the add on menu for the other flat fee extras.

ITB and bid review. A written go or no go on the invitation before your estimator starts the takeoff.

Specification review. The spec sections and product requirements for your trade, read before the takeoff.

Scope analysis. Your scope written as Above the Line, Below the Line and Exclusions, including what each addendum changed.

Contract commercial risk review. Payment terms, retainage and notice provisions flagged before you sign. A commercial risk review, not legal advice.

Addendum analysis is part of the outsourced estimating department Maverick runs for subcontractors: qualify the bid, take it off, handle the addenda and revisions, and verify field conditions before you order.

What you receive

  • Addendum change summary for your trade
  • Each addendum marked ADDED, REVISED or NO CHANGE
  • Sheet and spec section references
  • Quantity movement on the takeoff we delivered, when you order a revised takeoff
  • Revised files for the changed areas, when you order a revised takeoff

How it is priced

Quoted per project, with the price drivers named.

What sets the price

  • Change summary on a flooring takeoff, $50 per addendum
  • Revised takeoff, quoted before we start, based on the sheets that changed
  • Rush, quoted per job

See pricing for every trade

Questions and answers

What is an addendum comparison?

An addendum comparison checks an addendum, ASI or bulletin against the set you priced and reports only what changed for your trade. On a takeoff Maverick Takeoff Solutions delivered, it comes two ways: a change summary marking each addendum ADDED, REVISED or NO CHANGE with sheet and spec references, or a revised takeoff that also updates the quantities.

What if an addendum shows you missed something on the original takeoff?

Then the fix is free. Say addendum 2 reissues finish plan A601. A room the new sheet adds is an addendum change, quoted before we start. A base run the old A601 already showed and Maverick Takeoff Solutions left out is our miss, corrected and reissued at no charge. If it is unclear which, we show you both sheets first.

How much does an addendum comparison cost?

On a Maverick flooring takeoff, the addendum change summary is a flat $50 per addendum, ordered with or after the takeoff. It marks what changed for your trade but does not update quantities. A revised takeoff, and addendum work on other trades, is revision work, quoted before we start from the sheets that changed. Rush is quoted per job.

Why report an addendum that does not change my trade?

Because silence is not proof. In a Maverick Takeoff Solutions addendum comparison, an addendum that does not touch your scope is listed as NO CHANGE, so you know it was read, not skipped. When the bid form asks you to acknowledge each addendum by number, you can list it knowing what it did and did not change.

Can you handle an addendum that lands right before bid day?

Send it with your bid date. Maverick Takeoff Solutions confirms scope, price and delivery date in writing before work starts, so you know whether it lands before the bid. A tight date is a rush, quoted per job first, never added after. The 3 business day standard covers a full takeoff from complete documents; addendum delivery is confirmed per job.

What do you need from me to compare an addendum?

The addendum, ASI or bulletin with its narrative, every reissued or clouded sheet, any revised spec sections and RFI answers issued with it, the addendum number, the job name of the takeoff Maverick Takeoff Solutions delivered, and your bid date. If an earlier addendum never reached us, say so and we will flag it before starting.

When should I not send you the addendum?

When it is two clouded sheets on a job your estimator took off last week and has twenty free minutes. Reading it in house is faster and costs nothing extra. Send it to Maverick Takeoff Solutions when there are several addenda in bid week, the changes reach the specs, or nobody in house has the hours.

Illustration: the lobby in warm evening light, with lamps glowing over the lounge and dining area.

Send the addendum

Send it with the due date, and we confirm scope, price and delivery date in writing before any work starts.

Send the addendum